Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects

被引:1
|
作者
Maheswari, J. Uma [1 ]
Charlesraj, V. Paul C. [2 ]
Goyal, Anshul [1 ]
Mujumdar, Purva [1 ]
机构
[1] Indian Inst Technol Delhi, Dept Civil Engn, New Delhi 110016, India
[2] RICS Sch Built Environm, Sch Construct, Delhi Ncr 201313, India
关键词
critical path; reason/why code; relationship diagramming method; repetitive construction projects; resource-constrained project scheduling;
D O I
10.1016/j.proeng.2015.10.095
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional techniques for project scheduling such as Arrow Diagramming Method (ADM) and Precedence Diagramming Method (PDM) are continuously undergoing improvisation in order to replicate real-time construction scenario. Quite often, these methods are criticized for their limited information capturing ability. Relationship Diagramming Method (RDM) proposed by Plotnick in the recent past, is an improved variant of PDM, which can store additional information on relationships that would improve the scheduling process. In addition to basic data on the activities, additional information can be represented through five codes in RDM. Sequencing of activities in a construction project is primarily driven by the construction logic and/or the availability of resources. There is scope for arriving at alternate sequences with varying availability of resources to achieve the objectives of project scheduling as long as the construction logic is preserved. In order to achieve such a resource-constrained project scheduling, additional information on the restraints of the activities are necessary, which can be modelled using RDM through one of the five codes of RDM. The objective of this paper is to explore and exploit the Reason/Why code of RDM. The Reason and Why codes are associated with a restraint and for recording the description respectively. An activity's dependence on a resource has been captured using Reason/Why code in this study. It has been attempted to understand the impact of varying resource availability using an empirical equation on sequencing such resource dependent activities and its effect on critical path. The proposed concept is tested with data from a repetitive high rise construction project. The preliminary results have been well received. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:308 / 315
页数:8
相关论文
共 50 条
  • [1] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [2] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [3] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [4] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [5] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [6] Multi-Objective Resource-Constrained Scheduling in Large and Repetitive Construction Projects
    Lazari, Vasiliki
    Chassiakos, Athanasios
    Karatzas, Stylianos
    ALGORITHMS, 2024, 17 (08)
  • [7] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [8] HEURISTICS FOR SCHEDULING RESOURCE-CONSTRAINED PROJECTS IN MPM NETWORKS
    ZHAN, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 192 - 205
  • [9] Heuristic scheduling of resource-constrained projects with cash flows
    Padman, R
    SmithDaniels, DE
    SmithDaniels, VL
    NAVAL RESEARCH LOGISTICS, 1997, 44 (04) : 365 - 381
  • [10] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    Journal of Global Optimization, 2020, 76 : 211 - 241