Multi-agent-based proactive-reactive scheduling for a job shop

被引:45
|
作者
Lou, Ping [1 ]
Liu, Quan [1 ]
Zhou, Zude [1 ]
Wang, Huaiqing [2 ]
Sun, Sherry Xiaoyun [2 ]
机构
[1] Wuhan Univ Technol, Sch Informat Engn, Wuhan 430070, Peoples R China
[2] City Univ Hong Kong, Dept Informat Syst, Hong Kong, Hong Kong, Peoples R China
关键词
Proactive scheduling; Reactive scheduling; Robust scheduling; Multi-agent technology; MANUFACTURING SYSTEMS; SIMULATION; SUBJECT;
D O I
10.1007/s00170-011-3482-4
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Multi-agent-based proactive-reactive scheduling for job shops is presented, aiming to hedge against the uncertainties of dynamic manufacturing environments. This scheduling mechanism consists of two stages, including proactive scheduling stage and reactive scheduling stage. In the proactive scheduling stage, the objective is to generate a robust predictive schedule against known uncertainties; in the reactive scheduling stage, the objective is to dynamically rectify the predictive schedule to adapt to unknown uncertainties, viz. the reactive scheduling stage is actually complementary to the proactive scheduling stage. A stochastic model is presented, which concerns uncertain processing times in proactive scheduling stage on the basis of analyzing the deficiencies of a classical scheduling model for a production schedule in practice. For the stochastic scheduling problem, a multi-agent-based architecture is proposed and a distributed scheduling algorithm is used to solve this stochastic problem. Finally, the repair strategies are introduced to maintain the original proactive schedule when unexpected events occur. Case study examples show that this scheduling mechanism generates more robust schedules than the classical scheduling mechanism.
引用
收藏
页码:311 / 324
页数:14
相关论文
共 50 条
  • [1] Multi-agent-based proactive-reactive scheduling for a job shop
    Lou, P. (louping_98@163.com), 1600, Springer London (59): : 1 - 4
  • [2] Multi-agent-based proactive–reactive scheduling for a job shop
    Ping Lou
    Quan Liu
    Zude Zhou
    Huaiqing Wang
    Sherry Xiaoyun Sun
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 311 - 324
  • [3] GA-based proactive-reactive scheduling mechanism for a flexible job shop problem under multi-uncertainty
    Zhang, J. (zhangjie@sjtu.edu.cn), 1600, Trans Tech Publications Ltd (620):
  • [4] Multi-agent-based fuzzy scheduling for shop floor
    Li, Ying
    Zheng, Jia-Qiang
    Yang, Shan-Lin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 689 - 695
  • [5] Multi-agent-based fuzzy scheduling for shop floor
    Ying Li
    Jia-Qiang Zheng
    Shan-Lin Yang
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 689 - 695
  • [6] Research on multi-agent-based scheduling approach for job scheduling
    Rao, Yunqing
    Xie, Chang
    Li, Shuxia
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2004, 15 (10):
  • [7] A multi-agent model for reactive job shop scheduling
    Liu, N
    Abdelrahman, MA
    Ramaswamy, S
    PROCEEDINGS OF THE THIRTY-SIXTH SOUTHEASTERN SYMPOSIUM ON SYSTEM THEORY, 2004, : 241 - 245
  • [8] An effective multi-agent-based graph reinforcement learning method for solving flexible job shop scheduling problem
    Wan, Lanjun
    Fu, Long
    Li, Changyun
    Li, Keqin
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2025, 139
  • [9] Multi-agent-based agile scheduling
    Rabelo, EJ
    Camarinha-Matos, LM
    Afsarmanesh, H
    ROBOTICS AND AUTONOMOUS SYSTEMS, 1999, 27 (1-2) : 15 - 28
  • [10] A user-induced proactive-reactive scheduling tool for dynamic flow-shop environments
    Bahroun, Zied
    Shamayleh, Abdulrahim
    As'ad, Rami
    Zakaria, Rim
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2023, 10 (01)