A user-induced proactive-reactive scheduling tool for dynamic flow-shop environments

被引:0
|
作者
Bahroun, Zied [1 ]
Shamayleh, Abdulrahim [1 ]
As'ad, Rami [1 ]
Zakaria, Rim [1 ]
机构
[1] Amer Univ Sharjah, Coll Engn, Ind Engn Dept, POB 26666, Sharjah, U Arab Emirates
关键词
Proactive-reactive scheduling; flow-shop production system; flexible scheduling; dynamic environment; load adjustment; SINGLE-MACHINE; SHOP; ROBUST; STRATEGY; FLEXIBILITY; SYSTEM;
D O I
10.1080/23302674.2022.2156767
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a flexible scheduling tool for dynamic flow-shop production systems that is based on a non-preemptive version of the overlapping load adjustment approach. The developed tool adopts a novel two-phase proactive-reactive dynamic scheduling mechanism. The first phase characterises a set of possible scheduling alternatives without actually building any detailed schedule. This phase follows the earliest loading approach via exploiting the jobs' slack times across all machines. During the second phase, the dynamic build-up of schedules takes place in a progressive manner through a user-induced module that utilises graphical displays capturing in real-time the impact of unforeseen events on the ongoing schedule. Extensive experiments involving450 randomly generated test instances of three different sizes are carried out to assess the performance of the scheduling tool. The flexibility of the tool is assessed by the number of possible scheduling alternatives offered to the end-user. The results unveiled a high number of scheduling possibilities ranging from 155 schedules for the small size instances to 96,202 schedules for the large size instances. The relatively low number of tardy jobs (0.79 jobs on average) clearly exemplifies the robustness and quality of the scheduling alternatives despite the high number of potentially available schedules.
引用
收藏
页数:34
相关论文
共 16 条
  • [1] Integrated proactive-reactive tool for dynamic scheduling of parallel machine operations
    Bahroun, Zied
    Shamayleh, Abdulrahim
    As'ad, Rami
    Zakaria, Rim
    INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 2024, 16
  • [2] Multi-agent-based proactive-reactive scheduling for a job shop
    Lou, Ping
    Liu, Quan
    Zhou, Zude
    Wang, Huaiqing
    Sun, Sherry Xiaoyun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4): : 311 - 324
  • [3] Multi-agent-based proactive-reactive scheduling for a job shop
    Lou, P. (louping_98@163.com), 1600, Springer London (59): : 1 - 4
  • [4] Integrating sustainability into production scheduling in hybrid flow-shop environments
    Mokhtari-Moghadam, Ali
    Pourhejazy, Pourya
    Gupta, Deepak
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2023,
  • [5] Dynamic proactive-reactive scheduling for URLLC in 5G: Leveraging XGBoost and network virtualization
    Hendaoui, Saloua
    Hendaoui, Fatma
    Zangar, Nawel
    PHYSICAL COMMUNICATION, 2025, 68
  • [6] GA-based proactive-reactive scheduling mechanism for a flexible job shop problem under multi-uncertainty
    Zhang, J. (zhangjie@sjtu.edu.cn), 1600, Trans Tech Publications Ltd (620):
  • [7] A new proactive-reactive approach to hedge against uncertain processing times and unexpected machine failures in the two-machine flow shop scheduling problems
    Rahmani, D.
    SCIENTIA IRANICA, 2017, 24 (03) : 1571 - 1584
  • [8] Machine Learning prediction model for Dynamic Scheduling of Hybrid Flow-Shop based on Metaheuristic
    Hamiti, Abdelhakim Ghiles
    Bouazza, Wassim
    Laurent, Arnaud
    Mebarki, Nasser
    Kenani, Mohamed
    IFAC PAPERSONLINE, 2024, 58 (19): : 1228 - 1233
  • [9] Dynamic Scheduling of Multi-task for Hybrid Flow-shop Based on Energy Consumption
    Zeng Ling-li
    Zou Feng-xing
    Xu Xiao-hong
    Gao Zheng
    ICIA: 2009 INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, VOLS 1-3, 2009, : 463 - 467
  • [10] DYNAMIC SCHEDULING OF BLOCKING FLOW-SHOP BASED ON MULTI-POPULATION ACO ALGORITHM
    Zhang, Y. Q.
    Zhang, H.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (03) : 529 - 539