GA-based proactive-reactive scheduling mechanism for a flexible job shop problem under multi-uncertainty

被引:3
|
作者
机构
[1] Wang, Junliang
[2] Zhang, Jie
[3] Qin, Wei
来源
Zhang, J. (zhangjie@sjtu.edu.cn) | 1600年 / Trans Tech Publications Ltd卷 / 620期
关键词
Genetic algorithms;
D O I
10.4028/www.scientific.net/KEM.620.668
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Multi-agent-based proactive-reactive scheduling for a job shop
    Lou, Ping
    Liu, Quan
    Zhou, Zude
    Wang, Huaiqing
    Sun, Sherry Xiaoyun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4): : 311 - 324
  • [2] Multi-agent-based proactive-reactive scheduling for a job shop
    Lou, P. (louping_98@163.com), 1600, Springer London (59): : 1 - 4
  • [3] Multi-agent-based proactive–reactive scheduling for a job shop
    Ping Lou
    Quan Liu
    Zude Zhou
    Huaiqing Wang
    Sherry Xiaoyun Sun
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 311 - 324
  • [4] Flexible Job-shop Scheduling Problem Under Uncertainty Based On QPSO Algorithm
    Pan, Fengshan
    Ye, Chunming
    Yang, Jiao
    ADVANCED DESIGNS AND RESEARCHES FOR MANUFACTURING, PTS 1-3, 2013, 605-607 : 487 - +
  • [5] A Job Shop Scheduling Game with GA-based Evaluation
    Woo, Kim Jun
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2014, 8 (05): : 2627 - 2634
  • [6] Critical chain based Proactive-Reactive scheduling for Resource-Constrained project scheduling under uncertainty
    Peng, Wuliang
    Lin, Xuejun
    Li, Haitao
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 214
  • [7] Scheduling for the Flexible Job-Shop Problem Based on Genetic Algorithm(GA)
    Fan, ShunCheng
    Wang, JinFeng
    ADVANCED MATERIALS AND ENGINEERING MATERIALS, PTS 1 AND 2, 2012, 457-458 : 616 - 619
  • [8] Reactive scheduling approach for solving a realistic flexible job shop scheduling problem
    Mihoubi, B.
    Bouzouia, B.
    Gaham, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (19) : 5790 - 5808
  • [9] GA based heuristic for the open job shop scheduling problem
    Senthilkumar, P.
    Shahabudeen, P.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (3-4): : 297 - 301
  • [10] GA based heuristic for the open job shop scheduling problem
    Senthilkumar, P.
    Shahabudeen, P.
    International Journal of Advanced Manufacturing Technology, 2006, 30 (3-4): : 297 - 301