Bayesian Stochastic Dynamic Programming for Hydropower Generation Operation Based on Copula Functions

被引:12
|
作者
Tan, Qiao-feng [1 ,2 ]
Fang, Guo-hua [1 ]
Wen, Xin [1 ]
Lei, Xiao-hui [3 ]
Wang, Xu [3 ]
Wang, Chao [3 ]
Ji, Yi [4 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Peoples R China
[2] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Peoples R China
[3] China Inst Water Resources & Hydropower Res, Sate Key Lab Stimulat & Regulat Water Cycle River, Beijing 100038, Peoples R China
[4] Northeast Agr Univ, Sch Water Conservancy & Civil Engn, Harbin 150030, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Bayesian stochastic dynamic programming (BSDP); Copula function; Hydropower generation operation; Uncertainty; LIMITED WATER-LEVEL; OPTIMIZATION MODEL; RESERVOIR; SYSTEMS;
D O I
10.1007/s11269-019-02449-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bayesian stochastic dynamic programming (BSDP) has been widely used in hydropower generation operation, as natural inflow and forecast uncertainties can be easily determined by transition probabilities. In this study, we propose a theoretical estimation method (TEM) based on copula functions to calculate the transition probability under conditions of limited historical inflow samples. The explicit expression of the conditional probability is derived using copula functions and then used to calculate prior and likelihood probabilities, and the prior probability can be revised to the posterior probability once new forecast information is available by Bayesian formulation. The performance of BSDP models in seven forecast scenarios and two extreme conditions considering no or perfect forecast information is evaluated and compared. The case study in the Ertan hydropower station in China shows that (1) TEM can avoid the shortcomings of empirical estimation method (EMM) in calculating the transition probability, so that the prior and likelihood probability matrices can be distributed more uniformly with less zeros, and the problem that the posterior probability cannot be calculated can be avoided; (2) there is a positive correlation between operating benefit and forecast accuracy; and (3) the operating policy considering reliable forecast information can improve hydropower generation. However, an incorrect decision may be made in the case of low forecast accuracy.
引用
收藏
页码:1589 / 1607
页数:19
相关论文
共 50 条
  • [41] Optimal Reservoir Operation for Hydropower Generation using Non-linear Programming Model
    Arunkumar R.
    Jothiprakash V.
    Journal of The Institution of Engineers (India): Series A, 2012, 93 (2) : 111 - 120
  • [42] A Dynamic Programming Based Method for Optimum Linear Decomposition of Index Generation Functions
    Nagayama, Shinobu
    Sasao, Tsutomu
    Butler, Jon T.
    2019 IEEE 49TH INTERNATIONAL SYMPOSIUM ON MULTIPLE-VALUED LOGIC (ISMVL), 2019, : 144 - 149
  • [43] Combined Aggregated Sampling Stochastic Dynamic Programming and Simulation-Optimization to Derive Operation Rules for Large-Scale Hydropower System
    Wu, Xinyu
    Guo, Rui
    Cheng, Xilong
    Cheng, Chuntian
    ENERGIES, 2021, 14 (03)
  • [44] An Improvement for Cascaded Hydropower Investment Optimization Based on Dynamic Programming
    Wu Zhongqun
    Zhu Taihui
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 668 - 672
  • [45] Nonconvex Medium-Term Hydropower Scheduling by Stochastic Dual Dynamic Integer Programming
    Hjelmeland, Martin N.
    Zou, Jikai
    Helseth, Arild
    Ahmed, Shabbir
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2019, 10 (01) : 481 - 490
  • [46] Efficient Implementation of Sampling Stochastic Dynamic Programming Algorithm for Multireservoir Management in the Hydropower Sector
    Cote, Pascal
    Arsenault, Richard
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2019, 145 (04)
  • [47] A STOCHASTIC DYNAMIC-PROGRAMMING BASED APPROACH TO THE OPERATION OF A MULTI-RESERVOIR SYSTEM - REPLY
    GOULTER, IC
    WATER RESOURCES BULLETIN, 1988, 24 (04): : 889 - 889
  • [48] A STOCHASTIC DYNAMIC-PROGRAMMING BASED APPROACH TO THE OPERATION OF A MULTI-RESERVOIR SYSTEM - DISCUSSION
    PEI, D
    WATER RESOURCES BULLETIN, 1988, 24 (04): : 887 - 888
  • [49] STOCHASTIC DYNAMIC PROGRAMMING MODEL FOR THE OPERATION OF THE HIGH ASWAN DAM.
    Alarcon, Luis F.
    Marks, David H.
    Massachusetts Institute of Technology, School of Engineering, Department of Civil Engineering, Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics, Report, 1979, (246):
  • [50] Stochastic Generation Capacity Expansion Planning with Approximate Dynamic Programming
    Bukenberger, Jesse
    Palmintier, Bryan
    2018 IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D), 2018,