共 50 条
- [21] The use of PAR(p) model in the stochastic dual dynamic programming optimization scheme used in the operation planning of the Brazilian hydropower system 2004 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2004, : 397 - 402
- [22] Efficient Parallelization of the Stochastic Dual Dynamic Programming Algorithm Applied to Hydropower Scheduling ENERGIES, 2015, 8 (12): : 14287 - 14297
- [24] Application Research of Improved Dynamic Programming for Economic Operation of Gezhouba Hydropower Station APPLIED INFORMATICS AND COMMUNICATION, PT 5, 2011, 228 : 529 - 535
- [25] PROBABILISTIC MODELING USING COPULA FUNCTIONS BASED BAYESIAN APPROACH COMPUTATIONAL INTELLIGENCE IN BUSINESS AND ECONOMICS, 2010, 3 : 19 - 26
- [26] Application Research of Improved Dynamic Programming for Economic Operation of Gezhouba Hydropower Station 2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL V, 2010, : 327 - 330
- [28] A STOCHASTIC DYNAMIC-PROGRAMMING BASED APPROACH TO THE OPERATION OF A MULTI-RESERVOIR SYSTEM WATER RESOURCES BULLETIN, 1987, 23 (03): : 371 - 377