共 50 条
- [41] STOCHASTIC BEHAVIOUR OF A TWO-UNIT COLD STANDBY REDUNDANT SYSTEM WITH ADMINISTRATIVE DELAY AND TWO TYPES OF REPAIRS. Microelectronics Reliability, 1986, 26 (05): : 885 - 889
- [43] STOCHASTIC ANALYSIS OF A TWO-UNIT PARALLEL SYSTEM WITH PREVENTIVE MAINTENANCE JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2009, 2 (02): : 31 - 38
- [44] Cost-benefit analysis of a two-unit standby system with post-repair, activation time and correlated failures and repairs Journal of Quality in Maintenance Engineering, 1997, 3 (01): : 55 - 63
- [48] BUSY PERIOD ANALYSIS OF A 2-UNIT WARM STANDBY SYSTEM WITH IMPERFECT SWITCH MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 675 - 679
- [49] STOCHASTIC-ANALYSIS OF A 2 UNIT WARM STANDBY SYSTEM WITH 2 SWITCHING DEVICES MICROELECTRONICS AND RELIABILITY, 1991, 31 (06): : 1163 - 1173