Modeling the Optimal Maintenance Scheduling Strategy for Bridge Networks

被引:13
|
作者
Mao, Xinhua [1 ,2 ,3 ]
Jiang, Xiandong [3 ,4 ]
Yuan, Changwei [1 ,2 ]
Zhou, Jibiao [5 ]
机构
[1] Changan Univ, Sch Econ & Management, Xian 710064, Peoples R China
[2] Changan Univ, Minist Educ, Engn Res Ctr Highway Infrastruct Digitalizat, Xian 710064, Peoples R China
[3] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON N2L 3G1, Canada
[4] Yangzhou Polytech Inst, Coll Architectural Engn, Yangzhou 225000, Jiangsu, Peoples R China
[5] Tongji Univ, Coll Transportat Engn, Shanghai 200082, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 02期
基金
中国国家自然科学基金;
关键词
bridge network; optimal maintenance scheduling strategy; bi-level programming model; traffic delays; simulated annealing algorithm; SIMULATED ANNEALING ALGORITHM; LIFE-CYCLE MAINTENANCE; MINIMUM EXPECTED COST; BOTTOM-UP SOLUTION; OPTIMIZATION; SYSTEM; MANAGEMENT; UNCERTAINTY; DESIGN; REPLACEMENT;
D O I
10.3390/app10020498
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
An optimal maintenance scheduling strategy for bridge networks can generate an efficient allocation of resources with budget limits and mitigate the perturbations caused by maintenance activities to the traffic flows. This research formulates the optimal maintenance scheduling problem as a bi-level programming model. The upper-level model is a multi-objective nonlinear programming model, which minimizes the total traffic delays during the maintenance period and maximizes the number of bridges to be maintained subject to the budget limit and the number of crews. In the lower-level, the users' route choice following the upper-level decision is simulated using a modified user equilibrium model. Then, the proposed bi-level model is transformed into an equivalent single-level model that is solved by the simulated annealing algorithm. Finally, the model and algorithm are tested using a highway bridge network. The results show that the proposed method has an advantage in saving maintenance costs, reducing traffic delays, minimizing makespan compared with two empirical maintenance strategies. The sensitivity analysis reveals that traffic demand, number of crews, availability of budget, and decision maker's preference all have significant effects on the optimal maintenance scheduling scheme for bridges including time sequence and job sequence.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] OPTIMAL STRATEGIES FOR SCHEDULING CHECKPOINTS AND PREVENTIVE MAINTENANCE
    COFFMAN, EG
    GILBERT, EN
    IEEE TRANSACTIONS ON RELIABILITY, 1990, 39 (01) : 9 - 18
  • [42] Optimal preventive maintenance scheduling in semiconductor manufacturing
    Yao, XD
    Fernández-Gaucherand, E
    Fu, MC
    Marcus, SI
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2004, 17 (03) : 345 - 356
  • [43] Optimal generation scheduling strategy in a microgrid
    Toma, Lucian
    Tristiu, Ion
    Bulac, Constantin
    Neagoe-Stefana, Andreea-Georgiana
    2016 IEEE TRANSPORTATION ELECTRIFICATION CONFERENCE AND EXPO, ASIA-PACIFIC (ITEC ASIA-PACIFIC), 2016, : 491 - 496
  • [44] A GENERALIZED MODEL OF OPTIMAL MAINTENANCE STRATEGY
    Goulionis, John E.
    PAKISTAN JOURNAL OF STATISTICS, 2010, 26 (02): : 357 - 364
  • [45] Maintenance scheduling optimisation of Reverse Osmosis Networks (RONs) via a multistage Optimal Control reformulation
    Mappas, Vasileios
    Vassiliadis, Vassilios S.
    Dorneanu, Bogdan
    Routh, Alexander F.
    Arellano-Garcia, Harvey
    DESALINATION, 2022, 543
  • [46] Life-cycle connectivity-based maintenance strategy for bridge networks subjected to corrosion considering correlation of bridge resistances
    Han, Xu
    Frangopol, Dan M.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2022, 18 (12) : 1614 - 1637
  • [47] Opportunistic maintenance scheduling with stochastic opportunities duration in a predictive maintenance strategy
    Nzukam, C.
    Voisin, A.
    Levrat, E.
    Sauter, D.
    Iung, B.
    IFAC PAPERSONLINE, 2018, 51 (11): : 453 - 458
  • [48] Maintenance Scheduling of Transmission Bays Considering Selective Opportunistic Maintenance Strategy
    Xu, Bo
    Xu, Shenzhi
    Zhang, Qingzhen
    Zhang, Yumin
    2019 IEEE 3RD INTERNATIONAL CONFERENCE ON GREEN ENERGY AND APPLICATIONS (ICGEA 2019), 2019, : 40 - 44
  • [49] A Simheuristic Approach to Scheduling Sustainable and Reliable Maintenance for Bridge Infrastructure
    Pastore, Tommaso
    Mariniello, Giulio
    Asprone, Domenico
    MATHEMATICS, 2024, 12 (21)
  • [50] Bridge Maintenance Scheduling in Consideration of Resilience Against Natural Disasters
    Ishibashi, Ken
    Furuta, Hitoshi
    Nakatsu, Koichiro
    FRONTIERS IN BUILT ENVIRONMENT, 2020, 6