Modeling the Optimal Maintenance Scheduling Strategy for Bridge Networks

被引:13
|
作者
Mao, Xinhua [1 ,2 ,3 ]
Jiang, Xiandong [3 ,4 ]
Yuan, Changwei [1 ,2 ]
Zhou, Jibiao [5 ]
机构
[1] Changan Univ, Sch Econ & Management, Xian 710064, Peoples R China
[2] Changan Univ, Minist Educ, Engn Res Ctr Highway Infrastruct Digitalizat, Xian 710064, Peoples R China
[3] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON N2L 3G1, Canada
[4] Yangzhou Polytech Inst, Coll Architectural Engn, Yangzhou 225000, Jiangsu, Peoples R China
[5] Tongji Univ, Coll Transportat Engn, Shanghai 200082, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 02期
基金
中国国家自然科学基金;
关键词
bridge network; optimal maintenance scheduling strategy; bi-level programming model; traffic delays; simulated annealing algorithm; SIMULATED ANNEALING ALGORITHM; LIFE-CYCLE MAINTENANCE; MINIMUM EXPECTED COST; BOTTOM-UP SOLUTION; OPTIMIZATION; SYSTEM; MANAGEMENT; UNCERTAINTY; DESIGN; REPLACEMENT;
D O I
10.3390/app10020498
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
An optimal maintenance scheduling strategy for bridge networks can generate an efficient allocation of resources with budget limits and mitigate the perturbations caused by maintenance activities to the traffic flows. This research formulates the optimal maintenance scheduling problem as a bi-level programming model. The upper-level model is a multi-objective nonlinear programming model, which minimizes the total traffic delays during the maintenance period and maximizes the number of bridges to be maintained subject to the budget limit and the number of crews. In the lower-level, the users' route choice following the upper-level decision is simulated using a modified user equilibrium model. Then, the proposed bi-level model is transformed into an equivalent single-level model that is solved by the simulated annealing algorithm. Finally, the model and algorithm are tested using a highway bridge network. The results show that the proposed method has an advantage in saving maintenance costs, reducing traffic delays, minimizing makespan compared with two empirical maintenance strategies. The sensitivity analysis reveals that traffic demand, number of crews, availability of budget, and decision maker's preference all have significant effects on the optimal maintenance scheduling scheme for bridges including time sequence and job sequence.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] An optimal scheduling algorithm for an agent-based multicast strategy on irregular networks
    Lin, Yi-Fang
    Kang, Zhe-Hao
    Liu, Pangfeng
    Wu, Jan-Jan
    ADVANCES IN GRID AND PERVASIVE COMPUTING, PROCEEDINGS, 2006, 3947 : 165 - 174
  • [22] An optimal scheduling algorithm for an agent-based multicast strategy on irregular networks
    Liu, Pangfeng
    Lin, Yi-Fang
    Wu, Jan-Jan
    Kang, Zhe-Hao
    JOURNAL OF SUPERCOMPUTING, 2007, 42 (03): : 283 - 302
  • [23] An optimal scheduling algorithm for an agent-based multicast strategy on irregular networks
    Pangfeng Liu
    Yi-Fang Lin
    Jan-Jan Wu
    Zhe-Hao Kang
    The Journal of Supercomputing, 2007, 42 : 283 - 302
  • [24] Optimal scheduling strategy of household electrical equipment based on scenario dynamic modeling
    He, Xuxin
    Yan, Xiuying
    ENERGY AND BUILDINGS, 2024, 324
  • [25] Dynamic distributed rate control for wireless networks by optimal cartel maintenance strategy
    Han, Z
    Ji, Z
    Liu, KJ
    GLOBECOM '04: IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE, VOLS 1-6, 2004, : 3454 - 3458
  • [26] OPTIMAL MAINTENANCE SCHEDULING FOR A SYSTEM WITH INDIRECT AND DIRECT PREVENTIVE MAINTENANCE
    Park, J. H.
    Lee, S. C.
    Lee, S.
    Lie, C. H.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2011, 18 (07): : 335 - 343
  • [27] Parameterized Logistic Models for Bridge Inspection and Maintenance Scheduling
    Abdelmaksoud, Ahmed M.
    Balomenos, Georgios P.
    Becker, Tracy C.
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (10)
  • [28] A new strategy for the information management of bridge maintenance
    Kim, B. G.
    Jeong, Y. S.
    Lee, S. H.
    9TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS & MAINTENANCE OF STRUCTURES, 2005, : 305 - 313
  • [29] Decision support system for optimal bridge' maintenance
    Mahdi, Ibrahim M.
    Khalil, Ayman H.
    Mahdi, Hisham Arafat
    Mansour, Dina M. M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 342 - 356
  • [30] Maintenance Strategy for Bridge Components on the Basis of Performance
    Tserng, H. Ping
    Yin, Samuel Yen-Liang
    Chung, Chin-Lung
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2009, 23 (04) : 234 - 243