Constraint-based approach for steelmaking-continuous casting rescheduling

被引:0
|
作者
Li, Tieke [1 ]
Guo, Dongfen [1 ,2 ]
机构
[1] Univ Sci & Technol Beijing, 30 Xueyuan Rd, Beijing 100083, Peoples R China
[2] Shijiazhuang Post & Telecommun Tech Coll, Shijiazhuang 050021, Peoples R China
关键词
steel making-continuous casting; rescheduling; dynamic constraint satisfaction problem; constraint propagation;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Steelmaking-continuous casting rescheduling problem is an NP-hard problem. In this paper, we present a constraint-based approach for steelmaking-continuous casting rescheduling problem in integrated steel production environment. We treat the steel making-continuous casting rescheduling problem as a dynamic constraint satisfaction problem. To maintain the production stability and the material flow continuity after rescheduling, the perturbation measure function of the model is defined as the summation of the absolute deviation between the new start times and the original start times of operations in continuous casting stage, the variable selection and value selection heuristics is designed based on the resource slackness to minimize the change extent of the rescheduling solution. The resource conflicts in the original schedule are incrementally repaired by the variable selection and value selection heuristics. The validity of the proposed model and approach are demonstrated by the computational examples.
引用
收藏
页码:1108 / +
页数:2
相关论文
共 50 条
  • [41] Modeling and Hybrid Optimization of Batching Planning System for Steelmaking-continuous Casting Process
    Tianmu Ma
    Xiaochuan Luo
    Tianyou Chai
    IEEE/CAAJournalofAutomaticaSinica, 2014, 1 (02) : 113 - 126
  • [42] A two-stage robust optimization approach for steelmaking-continuous casting production scheduling under uncertainty
    Jiang S.-L.
    Wen Y.-M.
    Chen L.
    Cao L.-L.
    Peng G.-Z.
    Kongzhi yu Juece/Control and Decision, 2023, 38 (12): : 3516 - 3524
  • [43] LR-based integrated model for scheduling steelmaking-continuous casting-hot rolling
    Zhu, BL
    Yu, HB
    NEW TECHNOLOGIES FOR AUTOMATION OF METALLURGICAL INDUSTRY 2003, 2004, : 107 - 112
  • [44] Robust dynamic scheduling with uncertain release time for the steelmaking-continuous casting production
    Long, Jianyu
    Sun, Zhenzhong
    Hong, Ying
    Bai, Yun
    2018 INTERNATIONAL CONFERENCE ON SENSING, DIAGNOSTICS, PROGNOSTICS, AND CONTROL (SDPC), 2018, : 531 - 536
  • [45] Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
    Zheng, Zhong
    Long, Jian-yu
    Gao, Xiao-qiang
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2017, 24 (06) : 586 - 594
  • [46] Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
    Zhong Zheng
    Jian-yu Long
    Xiao-qiang Gao
    Journal of Iron and Steel Research(International), 2017, 24 (06) : 586 - 594
  • [47] Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
    Zhong Zheng
    Jian-yu Long
    Xiao-qiang Gao
    Journal of Iron and Steel Research International, 2017, 24 : 586 - 594
  • [48] A Hybrid Fuzzy PSO Algorithm for Solving Steelmaking-Continuous Casting Scheduling Problem
    Zarandi, M. H. Fazel
    Dorry, F.
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2018, 20 (01) : 219 - 235
  • [49] Decarburization ladle matching method of steel storage equipment in steelmaking-continuous casting
    Liu W.
    Pang X.
    Yu S.
    Chai T.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (12): : 3129 - 3138
  • [50] Scheduling model for steelmaking-continuous casting production considering cast delivery time
    Li, T
    Guo, DF
    Sun, L
    ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 227 - 231