Constraint-based approach for steelmaking-continuous casting rescheduling

被引:0
|
作者
Li, Tieke [1 ]
Guo, Dongfen [1 ,2 ]
机构
[1] Univ Sci & Technol Beijing, 30 Xueyuan Rd, Beijing 100083, Peoples R China
[2] Shijiazhuang Post & Telecommun Tech Coll, Shijiazhuang 050021, Peoples R China
关键词
steel making-continuous casting; rescheduling; dynamic constraint satisfaction problem; constraint propagation;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Steelmaking-continuous casting rescheduling problem is an NP-hard problem. In this paper, we present a constraint-based approach for steelmaking-continuous casting rescheduling problem in integrated steel production environment. We treat the steel making-continuous casting rescheduling problem as a dynamic constraint satisfaction problem. To maintain the production stability and the material flow continuity after rescheduling, the perturbation measure function of the model is defined as the summation of the absolute deviation between the new start times and the original start times of operations in continuous casting stage, the variable selection and value selection heuristics is designed based on the resource slackness to minimize the change extent of the rescheduling solution. The resource conflicts in the original schedule are incrementally repaired by the variable selection and value selection heuristics. The validity of the proposed model and approach are demonstrated by the computational examples.
引用
收藏
页码:1108 / +
页数:2
相关论文
共 50 条
  • [21] An iterated greedy matheuristic for scheduling in steelmaking-continuous casting process
    Hong, Juntaek
    Moon, Kyungduk
    Lee, Kangbok
    Lee, Kwansoo
    Pinedo, Michael L.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (02) : 623 - 643
  • [22] Multi-Crane Scheduling for Steelmaking-Continuous Casting Processes
    Qiu, Yan
    Zhao, Ziyan
    Liu, Shixin
    Wang, Feng
    2022 34TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2022, : 68 - 73
  • [23] Production re-planning based on genetic algorithm for steelmaking-continuous casting
    Long, Jian-Yu
    Zheng, Zhong
    Gao, Xiao-Qiang
    Gong, Yong-Min
    Hu, Wan-Zhe
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2014, 36 (01): : 115 - 122
  • [24] An Effective Subgradient Method for Scheduling a Steelmaking-Continuous Casting Process
    Mao, Kun
    Pan, Quan-Ke
    Chai, Tianyou
    Luh, Peter B.
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (03) : 1140 - 1152
  • [25] An Iterated Greedy Matheuristic for Scheduling in Steelmaking-Continuous Casting Process
    Hong, Juntaek
    Lee, Kwansoo
    Lee, Kangbok
    Moon, Kyungduk
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, APMS 2021, PT I, 2021, 630 : 62 - 72
  • [26] A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process
    Hao, Jinghua
    Liu, Min
    Jiang, Shenglong
    Wu, Cheng
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 966 - 979
  • [27] Simulation Model of a Steelmaking-Continuous Casting Process Based on Dynamic-Operation Rules
    Shao, Xin
    Liu, Qing
    Chen, Hongzhi
    Zhang, Jiangshan
    Gao, Shan
    Li, Shaoshuai
    MATERIALS, 2024, 17 (17)
  • [28] A Modified RBM-Based Estimation of Distribution Algorithm for Steelmaking-Continuous Casting Scheduling
    Jiang, Shenglong
    Liu, Min
    Hao, Jinghua
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 1836 - 1841
  • [29] An Efficient and Effective Approach for the Scheduling of Steelmaking-continuous Casting Process With Multi Different Refining Routes
    Sun, Liangliang
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (04) : 10454 - 10461
  • [30] Computer-aided simulation of steelmaking-continuous casting production scheduling
    Yu, Gang
    Tian, Nai-Yuan
    Xu, An-Jun
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2009, 31 (09): : 1183 - 1188