Scheduling of Construction Projects under Resource-Constrained Conditions with a Specifically Developed Software using Genetic Algorithms

被引:3
|
作者
Erdal, Mursel [1 ]
Kanit, Recep [1 ]
机构
[1] Gazi Univ, Fac Technol, Dept Civil Engn, TR-06500 Ankara, Turkey
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2021年 / 28卷 / 04期
关键词
genetic algorithms; optimization; renewable resource; scheduling; sustainability; OPTIMIZATION; MULTIPLE;
D O I
10.17559/TV-20200305101811
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this study is to develop a genetic algorithm (GA) based software that can perform resource allocation close to optimum and that can determine the critical path by minimizing the project duration according to the resource profile for a present work schedule and resource pool using a programmable objective function. In this context, the methodology of GAs was presented, the software was developed and the performance of this software was tested with a sample project. With the developed software, by minimizing the activity durations in both constrained and unconstrained resource conditions, projects can be scheduled, total duration and the critical path of the projects can be determined. With this software, any construction company will be able to determine how much time would be required to complete a project at the bidding stage by considering its resources and constraints and can take the required precautions. The main difference of this present study is that the developed code performs minimization of schedule duration integrated with resource allocation and levelling. It also determines the critical path of the final solutions. Both renewable and non-renewable resources are included in the code which is not often considered in the literature. By minimizing project duration and optimizing resource allocation, construction projects can become more sustainable, and the environmental impact of the construction process could be minimized.Y
引用
收藏
页码:1362 / 1370
页数:9
相关论文
共 50 条
  • [21] GENETIC ALGORITHMS FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM IN AIRCRAFT HEAVY MAINTENANCE
    Pimapunsri, Kusol
    Weeranant, Darawan
    Riel, Andreas
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 28 (06):
  • [22] Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects
    Maheswari, J. Uma
    Charlesraj, V. Paul C.
    Goyal, Anshul
    Mujumdar, Purva
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 308 - 315
  • [23] Work package-based information modeling for resource-constrained scheduling of construction projects
    Wang, Heng-Wei
    Lin, Jia-Rui
    Zhang, Jian-Ping
    AUTOMATION IN CONSTRUCTION, 2020, 109
  • [24] Resource-constrained scheduling of partitioned algorithms on processor arrays
    Dion, M
    Risset, T
    Robert, Y
    INTEGRATION-THE VLSI JOURNAL, 1996, 20 (02) : 139 - 159
  • [25] Construction Schedule Management Using Resource-Constrained Project Scheduling Model
    Wang J.
    Zeng S.
    Ju J.
    Tongji Daxue Xuebao/Journal of Tongji University, 2017, 45 (10): : 1561 - 1568
  • [26] Scheduling Multi-Mode Resource-Constrained Projects Using Heuristic Rules Under Uncertainty Environment
    Abdel-Basset, Mohamed
    Sleem, Ahmed
    Atef, Asmaa
    Nam, Yunyoung
    Abouhawwash, Mohamed
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 70 (01): : 847 - 874
  • [27] Resource-constrained scheduling of partitioned algorithms on processor arrays
    Ecole Normale Superieure de Lyon, Lyon, France
    Integr VLSI J, 2 (139-159):
  • [28] Resource allocation in construction projects using genetic algorithms
    Al-Tabtabai, H
    Alex, AP
    KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 1998, 25 (01): : 145 - 161
  • [29] Fuzzy optimal model for resource-constrained construction scheduling
    Leu, SS
    Chen, AT
    Yang, CH
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1999, 13 (03) : 207 - 216
  • [30] Performance analysis of scheduling rules in resource-constrained multiple projects
    Kanagasabapathi, Balasubramanian
    Rajendran, Chandrasekharan
    Ananthanarayanan, Kuppuswamy
    International Journal of Industrial and Systems Engineering, 2009, 4 (05) : 502 - 535