Multi-objective scheduling with fuzzy due-date

被引:22
|
作者
Murata, T
Gen, M
Ishibuchi, H
机构
[1] Ashikaga Inst Technol, Dept Ind & Syst Engn, Ashikaga, Tochigi 3268558, Japan
[2] Univ Osaka Prefecture, Dept Ind Engn, Osaka 5998531, Japan
关键词
fuzzy flowshop scheduling problem; fuzzy due-date; multi-objective scheduling problem;
D O I
10.1016/S0360-8352(98)00128-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we examine the characteristic features of multi-objective scheduling problems formulated with the concept of fuzzy due-date. By computer simulations, we show that various scheduling criteria can be expressed by modifying the shape of membership functions of fuzzy due-dates. We also show the difficulty in handling the minimum satisfaction grade as a scheduling criterion. This difficulty is caused by the fact that the minimum satisfaction grade is zero for almost all schedules. This makes many search algorithms inefficient. We suggest an idea to cope with this difficulty. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:439 / 442
页数:4
相关论文
共 50 条
  • [31] A Fuzzy Multi-objective Optimizing Scheduling for Operation Room in Hospital
    Wang, Di
    Xu, Jiuping
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 614 - 618
  • [32] FUZZY MODELING OF MULTI-OBJECTIVE WEIGHTED SINGLE MACHINE SCHEDULING
    Mehrabad, Mohammad Saidi
    Pahlavani, Ali
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 353 - 364
  • [33] Multi-objective Fuzzy Job-shop of Pharmaceutical Enterprise Scheduling Considering Uncertain and Multi-objective Features
    Zhong, Zufeng
    Yang, Hongyan
    Ye, Caihong
    Yang, Man
    EKOLOJI, 2019, 28 (107): : 2301 - 2311
  • [34] The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem
    Tavakkoli-Moghaddam, Reza
    Javadi, Babak
    Jolai, Fariborz
    Ghodratnama, Ali
    APPLIED SOFT COMPUTING, 2010, 10 (03) : 919 - 925
  • [35] SCHEDULING TO MINIMIZE WEIGHTED EARLINESS AND TARDINESS ABOUT A COMMON DUE-DATE
    DE, P
    GHOSH, JB
    WELLS, CE
    COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (05) : 465 - 475
  • [36] Due-date assignment and single machine scheduling with compressible processing times
    Cheng, TCE
    Oguz, C
    Qi, XD
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 43 (2-3) : 107 - 113
  • [37] DUE-DATE ASSIGNMENT AND EARLY/TARDY SCHEDULING ON IDENTICAL PARALLEL MACHINES
    DE, P
    GHOSH, JB
    WELLS, CE
    NAVAL RESEARCH LOGISTICS, 1994, 41 (01) : 17 - 32
  • [38] Due-date assignment scheduling with only mean and support of processing times
    Yue, Qing
    Zhou, Shenghai
    Yan, Haiyan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (04) : 1358 - 1381
  • [39] Due-date quotation model for manufacturing system scheduling under uncertainty
    Wang, Zhiguo
    Ng, Tsan Sheng
    Pang, Chee Khiang
    DISCRETE EVENT DYNAMIC SYSTEMS-THEORY AND APPLICATIONS, 2021, 31 (02): : 271 - 293
  • [40] Minmax scheduling problems with common due-date and completion time penalty
    Baruch Mor
    Journal of Combinatorial Optimization, 2019, 38 : 50 - 71