Multi-objective scheduling with fuzzy due-date

被引:22
|
作者
Murata, T
Gen, M
Ishibuchi, H
机构
[1] Ashikaga Inst Technol, Dept Ind & Syst Engn, Ashikaga, Tochigi 3268558, Japan
[2] Univ Osaka Prefecture, Dept Ind Engn, Osaka 5998531, Japan
关键词
fuzzy flowshop scheduling problem; fuzzy due-date; multi-objective scheduling problem;
D O I
10.1016/S0360-8352(98)00128-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we examine the characteristic features of multi-objective scheduling problems formulated with the concept of fuzzy due-date. By computer simulations, we show that various scheduling criteria can be expressed by modifying the shape of membership functions of fuzzy due-dates. We also show the difficulty in handling the minimum satisfaction grade as a scheduling criterion. This difficulty is caused by the fact that the minimum satisfaction grade is zero for almost all schedules. This makes many search algorithms inefficient. We suggest an idea to cope with this difficulty. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:439 / 442
页数:4
相关论文
共 50 条
  • [21] Due-date assignment and maintenance activity scheduling problem
    Mosheiov, Gur
    Oron, Daniel
    MATHEMATICAL AND COMPUTER MODELLING, 2006, 44 (11-12) : 1053 - 1057
  • [22] Research on multi-objective fuzzy job shop scheduling
    Lei, De-Ming
    Wu, Zhi-Ming
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (02): : 174 - 179
  • [23] Scheduling under a common due-date on parallel unrelated machines
    Adamopoulos, GI
    Pappis, CP
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (03) : 494 - 501
  • [24] Due-date assignment and single machine scheduling with deteriorating jobs
    Cheng, TCE
    Kang, L
    Ng, CT
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (02) : 198 - 203
  • [25] Batch scheduling and common due-date assignment on a single machine
    Cheng, TCE
    Kovalyov, MY
    DISCRETE APPLIED MATHEMATICS, 1996, 70 (03) : 231 - 245
  • [26] SCHEDULING IN SERIAL MULTIPRODUCT BATCH PROCESSES WITH DUE-DATE PENALTIES
    KU, HM
    KARIMI, I
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1990, 29 (04) : 580 - 590
  • [27] Proactive earliest due-date scheduling in wireless packet networks
    Teh, KH
    Kong, PY
    Jiang, SM
    2003 INTERNATIONAL CONFERENCE ON COMMUNICATION TECHNOLOGY, VOL 1 AND 2, PROCEEDINGS, 2003, : 816 - 820
  • [28] Optimization of due-date objectives in scheduling semiconductor batch manufacturing
    Gupta, A. K.
    Sivakumar, A. I.
    INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 2006, 46 (12-13): : 1671 - 1679
  • [29] Priority Rules for Multi-Task Due-Date Scheduling under Varying Processing Costs
    Xu, Yunjian
    Shi, Cong
    Duenyas, Izak
    PRODUCTION AND OPERATIONS MANAGEMENT, 2016, 25 (12) : 2086 - 2102
  • [30] Multi-factory Job Shop Scheduling With Due Date Objective
    Lohmer, Jacob
    Spengler, Daniel
    Lasch, Rainer
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 79 - 84