Engineering Projects Assessment Using Earned Value Management with Performance Indexes Evaluation and Statistical Methods

被引:3
|
作者
Rubio, J. [1 ]
Munoz, J. I. [2 ]
Otegi, J. R. [3 ]
机构
[1] Dresser Rand Inc, Minano, Spain
[2] Univ Castilla La Mancha, Albacete, Spain
[3] Univ Basque Country EHU UPV, Leioa, Spain
关键词
D O I
10.1007/978-3-319-12754-5_5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:61 / 72
页数:12
相关论文
共 50 条
  • [31] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Luis Ponz-Tienda, Jose
    Pellicer, Eugenio
    Yepes, Victor
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2012, 13 (01): : 56 - 68
  • [32] Earned Scope Management: Scope Performance Evaluation for Software Projects Considering People and Effort as Resources
    Valdes-Souto, Francisco
    2019 7TH INTERNATIONAL CONFERENCE IN SOFTWARE ENGINEERING RESEARCH AND INNOVATION (CONISOFT 2019), 2019, : 213 - 222
  • [33] Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia
    Ibrahim, Maan Nihad
    Thorpe, David
    Mahmood, Muhammad Nateque
    CONSTRUCTION INNOVATION-ENGLAND, 2019, 19 (04): : 550 - 569
  • [34] Earned value-based performance monitoring of facility construction projects
    De Marco, Alberto
    Narbaev, Timur
    JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (01) : 69 - +
  • [35] Value Engineering Factors with an Impact on Design Management Performance of Construction Projects
    Gunduz, Murat
    Aly, Aly A.
    El Mekkawy, Tarek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (03)
  • [36] Study on performance evaluation of effects on integration management of engineering projects
    Xu Guangshu
    ICCIT: 2009 FOURTH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND CONVERGENCE INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2009, : 306 - 310
  • [37] Research on performance evaluation of aerospace model engineering project based on quality fuzzy evaluation and earned value method
    Liu, Wei-Wei
    Zhang, Tie-Nan
    Jia, Yun-Qing
    Binggong Xuebao/Acta Armamentarii, 2011, 32 (SUPPL. 1): : 81 - 85
  • [38] Control of construction projects using the Earned Value Method - case study
    Araszkiewicz, Krystyna
    Bochenek, Magdalena
    OPEN ENGINEERING, 2019, 9 (01): : 186 - 195
  • [39] Performance measurement of schedule and cost analysis by using earned value management for a residential building
    Sruthi, Mullapudi Durga
    Aravindan, Achuthan
    MATERIALS TODAY-PROCEEDINGS, 2020, 33 : 524 - 532
  • [40] Application of Earned Value Management to Compute the Project Performance Using Analytical Network Process
    Ramani, Sujatha Evangelin
    Sruthi, N.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (02) : 254 - 265