Engineering Projects Assessment Using Earned Value Management with Performance Indexes Evaluation and Statistical Methods

被引:3
|
作者
Rubio, J. [1 ]
Munoz, J. I. [2 ]
Otegi, J. R. [3 ]
机构
[1] Dresser Rand Inc, Minano, Spain
[2] Univ Castilla La Mancha, Albacete, Spain
[3] Univ Basque Country EHU UPV, Leioa, Spain
关键词
D O I
10.1007/978-3-319-12754-5_5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:61 / 72
页数:12
相关论文
共 50 条
  • [21] The research on optimization of earned value management method in engineering budget management
    School of Business and Administration, North China Electric Power University, Beijing, China
    不详
    Open Civ. Eng. J., 1 (369-375):
  • [22] Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions
    Anbari Moghadam M.
    Bagherpour M.
    Ghannadpour S.F.
    Environment Systems and Decisions, 2024, 44 (1) : 45 - 68
  • [23] The research on optimization of earned value management method in engineering budget management
    Gedi, Ji
    Yunna, Wu
    Changqing, O.
    Open Civil Engineering Journal, 2015, 9 (01): : 369 - 375
  • [24] Randomized Earned Value Method for the rolling assessment of construction projects advancement
    Kasprowicz, Tadeusz
    Starczyk-Kolbyk, Anna
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 501 - 520
  • [25] Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects
    Balali, Amirhossein
    Valipour, Alireza
    Antucheviciene, Jurgita
    Saparauskas, Jonas
    SYMMETRY-BASEL, 2020, 12 (10): : 1 - 17
  • [26] Regression Modeling for Prediction of Earned Value Indexes in Public Building Construction Projects: The case of Ethiopia
    Ayalew, Genet Melkamu
    Meharie, Meseret Getnet
    Ayalew, Girmay Getawa
    COGENT ENGINEERING, 2023, 10 (01):
  • [27] Using earned-value analysis to better manage projects
    Hayes, Heather
    2002, Advanstar Communications (26):
  • [28] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís Ponz-Tienda
    Eugenio Pellicer
    Víctor Yepes
    Journal of Zhejiang University SCIENCE A, 2012, 13 : 56 - 68
  • [29] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Jos Lus PONZTIENDA
    Eugenio PELLICER
    Vctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, 13 (01) : 56 - 68
  • [30] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís PONZ-TIENDA
    Eugenio PELLICER
    Víctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, (01) : 56 - 68