Reasonable safety management cost for housing construction

被引:0
|
作者
Son, Ki Sang [1 ]
Yang, Hak Soo [1 ]
Serpell, Alfredo [2 ]
机构
[1] Seoul Natl Univ Technol, Seoul, South Korea
[2] Pentis Univ Catholica Chile, Santiago, Chile
关键词
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Safety Cost that is prescribed in Safety and health Law should be included in budget and be used for worker's safety and health improvement in all Korean construction sites. Recently, there appears to be problems using this safety cost in real construction site. It is that there happens to be shortages and large remainder of safety cost. The purpose of this study is to find out reasonable safety cost and propose a new safety cost equation model. The procedure of the study consists of 1st and 2nd questionnaire survey, correlation analysis, regression equation, case study for practical verification, comparison analysis and conclusions.
引用
收藏
页码:1423 / +
页数:2
相关论文
共 50 条
  • [41] Construction cost information management in Nigeria
    Akintoye, Akintola S.
    Ajewole, Olusanya
    Olomolaiye, Paul O.
    Construction Management and Economics, 1992, 10 (02) : 107 - 116
  • [42] CHARACTERISTICS OF COST MANAGEMENT IN CONSTRUCTION PROJECTS
    Simion-Melinte, Cezar
    GLOBALIZATION AND INTERCULTURAL DIALOGUE: MULTIDISCIPLINARY PERSPECTIVES - ECONOMY AND MANAGEMENT, 2014, : 810 - 818
  • [43] Study on Cost Management of Construction Enterprises
    Wu, Tao
    Guan, Jinhua
    2011 INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND MANAGEMENT ENGINEERING (ESME 2011), VOLS 1-5, 2011, : 597 - 600
  • [44] Construction and Application of Safety Management Scenarios at Construction Sites
    Yang, Qiang
    Yan, Xiaojie
    Chen, Wenkai
    Fan, Juncheng
    APPLIED SCIENCES-BASEL, 2024, 14 (01):
  • [45] Analysis on the Cost Management of Construction Enterprises
    Feng, Huihong
    Chen, Yu
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 440 - 443
  • [46] Project Management and Delay Factors of Public Housing Construction
    Kog, Yue Choong
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2018, 23 (01)
  • [47] Developing a Construction Duration Estimation Model to Ensure the Safety in Apartment Housing Construction Sites
    Jin Ho Lim
    Dae Young Kim
    Daeyoung Kim
    Seong-Chun Jeong
    Do-Kyun Seol
    Young-Ki Huh
    KSCE Journal of Civil Engineering, 2018, 22 : 2195 - 2205
  • [48] Developing a Construction Duration Estimation Model to Ensure the Safety in Apartment Housing Construction Sites
    Lim, Jin Ho
    Kim, Dae Young
    Kim, Daeyoung
    Jeong, Seong-Chun
    Seol, Do-Kyun
    Huh, Young-Ki
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (07) : 2195 - 2205
  • [49] Quality management of RDP housing construction: myth or reality?
    Amoah, Christopher
    Van Schalkwyk, Tanya
    Kajimo-Shakantu, Kahilu
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2022, 20 (05) : 1101 - 1121
  • [50] The Cost Management of Construction Project Based on Lean Management
    Liu, X. W.
    Wu, Z. G.
    He, R. L.
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1861 - 1867