Optimization of Cycle Time in an Assembly Line Balancing Problem

被引:8
|
作者
Raj, Vishnu A. S. [1 ]
Mathew, Jeeno [1 ]
Jose, Peter [1 ]
Sivan, Gishnu [1 ]
机构
[1] St Josephs Coll Engn & Technol Palai, Dept ME, Kottayam, Kerala, India
关键词
Mixed model; Combinatorial problems; Assembly lines; ALGORITHM;
D O I
10.1016/j.protcy.2016.08.231
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Assembly line is a sequential work flow production systems which are still typical in the mass production of standard products. In mixed model assembly line system, it can produce the production sequentially by mixing more than one product on the same line. Different range of products are produced on the same line are quiet similar to the main product This paper proposes an approach to the mixed model assembly line balancing problem (MALBP) with parallel workstations. Different methods are developed to solve assembly line balancing problems. The existing methods to solve assembly line balancing problem cannot be applied to combinatorial type problems. When we use heuristics methods for a combinatorial type problem which has more number of work elements, it may not give an optimal solution and become tedious. So this paper is aimed to propose a method to solve such type of complex line balancing problems. (C) 2016 Published by Elsevier Ltd.
引用
收藏
页码:1146 / 1153
页数:8
相关论文
共 50 条
  • [1] An Optimization Model for Assembly Line Balancing Problem with Uncertain Cycle Time
    Cao, Yong
    Li, Yuan
    Liu, Qinghua
    Zhang, Jie
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [2] Cycle Time Enhancement by Simulated Annealing for a Practical Assembly Line Balancing Problem
    Huong Mai Dinh
    Dung Viet Nguyen
    Long Van Truong
    Thuan Phan Do
    Thao Thanh Phan
    Nghia Duc Nguyen
    INFORMATICA-AN INTERNATIONAL JOURNAL OF COMPUTING AND INFORMATICS, 2020, 44 (02): : 127 - 138
  • [3] Models for Optimization of Total Assembly Time and Assembly Line Balancing
    Kleiza, V.
    Tilindis, J.
    INTELLIGENT TECHNOLOGIES IN LOGISTICS AND MECHATRONICS SYSTEMS: ITEMS 2009, 2009, : 100 - 103
  • [4] Improve Assembly Line Balancing by Changing Cycle Time
    Chao, Yongsheng
    Sun, Wenlei
    2016 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, 2016, : 100 - 105
  • [5] Procedures for the Time and Space constrained Assembly Line Balancing Problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (03) : 473 - 481
  • [6] Estimation of time and cost oriented assembly line balancing problem
    Grzechca, Waldemar
    ICSENG 2008: INTERNATIONAL CONFERENCE ON SYSTEMS ENGINEERING, 2008, : 248 - 253
  • [7] Simulated annealing algorithms for the multi-manned assembly line balancing problem: minimising cycle time
    Roshani, Abdolreza
    Giglio, Davide
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (10) : 2731 - 2751
  • [8] A line balancing problem with parallel workers and cycle time minimization
    Melega, Gislaine Mara
    Belgarch, Sanae
    Jans, Raf
    Paquette, Julie
    INFOR, 2024,
  • [9] Ant colony optimization for type II assembly line balancing problem
    Zheng, Qiao-Xian
    Li, Yuan-Xiang
    Li, Ming
    Tang, Qiu-Hua
    Lu, Su-Li
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (05): : 999 - 1005
  • [10] A Three-Stage Optimization Method for Assembly Line Balancing Problem
    Yin, Qidong
    Luo, Xiaochuan
    IEEE ACCESS, 2020, 8 : 143607 - 143621