Optimization of Cycle Time in an Assembly Line Balancing Problem

被引:8
|
作者
Raj, Vishnu A. S. [1 ]
Mathew, Jeeno [1 ]
Jose, Peter [1 ]
Sivan, Gishnu [1 ]
机构
[1] St Josephs Coll Engn & Technol Palai, Dept ME, Kottayam, Kerala, India
关键词
Mixed model; Combinatorial problems; Assembly lines; ALGORITHM;
D O I
10.1016/j.protcy.2016.08.231
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Assembly line is a sequential work flow production systems which are still typical in the mass production of standard products. In mixed model assembly line system, it can produce the production sequentially by mixing more than one product on the same line. Different range of products are produced on the same line are quiet similar to the main product This paper proposes an approach to the mixed model assembly line balancing problem (MALBP) with parallel workstations. Different methods are developed to solve assembly line balancing problems. The existing methods to solve assembly line balancing problem cannot be applied to combinatorial type problems. When we use heuristics methods for a combinatorial type problem which has more number of work elements, it may not give an optimal solution and become tedious. So this paper is aimed to propose a method to solve such type of complex line balancing problems. (C) 2016 Published by Elsevier Ltd.
引用
收藏
页码:1146 / 1153
页数:8
相关论文
共 50 条
  • [21] Production improvement on the assembly line through cycle time optimization
    Kumar, Pankaj
    Prasad, Shashi Bhushan
    Patel, Dharmendra
    Gupta, Laxmi
    Nag, Manmeet Bali
    Chadha, Priyanka
    INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2023, 17 (05): : 2617 - 2630
  • [22] Production improvement on the assembly line through cycle time optimization
    Pankaj Kumar
    Shashi Bhushan Prasad
    Dharmendra Patel
    Laxmi Gupta
    Manmeet Bali Nag
    Priyanka Chadha
    International Journal on Interactive Design and Manufacturing (IJIDeM), 2023, 17 : 2617 - 2630
  • [23] An investigation of mixed-model assembly line balancing problem with uncertain assembly time in remanufacturing
    Liu, Qingtao
    Wei, Xinji
    Wang, Qi
    Song, Jiayao
    Lv, Jingxiang
    Liu, Ying
    Tang, Ou
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 198
  • [24] Theory of Assembly Buffer for Line Balancing Problem
    Yu, J. J.
    Zhang, D. C.
    Zhou, M. X.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1061 - 1064
  • [25] AN ASSEMBLY LINE BALANCING PROBLEM AUTOMOTIVE CABLES
    Triki, Hager
    Hachicha, Wafik
    Mellouli, Ahmed
    Masmoudi, Faouzi
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2015, 6 (01) : 59 - 66
  • [26] A FUZZY APPROACH TO ASSEMBLY LINE BALANCING PROBLEM
    Kalender, F. Yesim
    Yilmaz, Murat Mustafa
    Turkbey, Orhan
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2008, 23 (01): : 129 - 138
  • [27] Assembly Line Balancing Optimization Based on Simulation
    Pei, Xiaobing
    Cha, Hongyang
    PROCEEDINGS OF THE 2015 2ND INTERNATIONAL WORKSHOP ON MATERIALS ENGINEERING AND COMPUTER SCIENCES (IWMECS 2015), 2015, 33 : 339 - 342
  • [28] Balancing and Optimization of Vacuum Cleaner Assembly Line
    Ma, Yan-hua
    Kong, Fan-sen
    Jiang, Ying
    Zhang, Yu
    Ao, Yan
    MECHANICAL AND ELECTRONICS ENGINEERING III, PTS 1-5, 2012, 130-134 : 3731 - 3735
  • [29] Y Optimization on mixed-flow assembly u-line balancing problem
    Wang, Ting
    Fan, Ran
    Peng, Yanjie
    Wang, Xin
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2019, 22 (Suppl 4): : S8249 - S8257
  • [30] Ant Colony Optimization with Look Forward Ant in Solving Assembly Line Balancing Problem
    Sulaiman, Mohd Nor Irman
    Choo, Yun-Huoy
    Chong, Kuan Eng
    2011 3RD CONFERENCE ON DATA MINING AND OPTIMIZATION (DMO), 2011, : 115 - 121