A line balancing problem with parallel workers and cycle time minimization

被引:0
|
作者
Melega, Gislaine Mara [1 ,2 ]
Belgarch, Sanae [1 ]
Jans, Raf [1 ]
Paquette, Julie [1 ]
机构
[1] HEC Montreal, Dept Logist & Operat Management, 3000 Chem Cote St Catherine, Montreal, PQ H3T 2A7, Canada
[2] CIRRELT, 3000 Chem Cote St Catherine, Montreal, PQ H3T 2A7, Canada
关键词
Line balancing; parallel stations; general and serial task structure; network flow formulation; third party logistics provider; MODEL ASSEMBLY LINES; ALGORITHM; MULTIPLE; ASSIGNMENT; DESIGN; OPTIMIZATION; WORKSTATIONS; BRANCH;
D O I
10.1080/03155986.2024.2393039
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We study the problem of balancing assembly lines with parallel workers, motivated by features observed at a third-party logistics provider. The assembly line differs from the two known types of line balancing problems in the literature since it determines simultaneously the line cycle time and the number of workers per station. Furthermore, each station can be occupied by more than one worker and a restriction on the minimum number of stations is imposed. This new type of line balancing problem minimizes the line cycle time, where two types of decisions must be made: how to group the tasks into stations and how many workers to assign to each station. We adapt mathematical models based on assembly line balancing problems with parallel stations. Furthermore, we propose a new model based on network flow formulations for the special case of lines with a serial task structure, frequently observed at the company. We perform an extensive computational study with realistic instances in order to compare the speed of solving different formulations, which is important as such a problem is at the operational level. We also provide a sensitivity analysis of key parameters aiming to better understand the trade-offs and provide meaningful managerial insights.
引用
收藏
页数:31
相关论文
共 50 条
  • [1] Optimization of Cycle Time in an Assembly Line Balancing Problem
    Raj, Vishnu A. S.
    Mathew, Jeeno
    Jose, Peter
    Sivan, Gishnu
    1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016, 2016, 25 : 1146 - 1153
  • [2] Biobjective Parallel Disassembly Line Balancing: A Problem Considering Government Benefit Workers
    Qin, Shujin
    Wang, Jiacun
    Qi, Liang
    Guo, Xiwang
    Li, Jiawei
    IEEE SYSTEMS MAN AND CYBERNETICS MAGAZINE, 2024, 10 (03): : 56 - 63
  • [3] An Optimization Model for Assembly Line Balancing Problem with Uncertain Cycle Time
    Cao, Yong
    Li, Yuan
    Liu, Qinghua
    Zhang, Jie
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [4] A network model for parallel line balancing problem
    Benzer, Recep
    Goekcen, Hadi
    Cetinyokus, Tahsin
    Cercioglu, Hakan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2007, 2007
  • [5] Cycle Time Enhancement by Simulated Annealing for a Practical Assembly Line Balancing Problem
    Huong Mai Dinh
    Dung Viet Nguyen
    Long Van Truong
    Thuan Phan Do
    Thao Thanh Phan
    Nghia Duc Nguyen
    INFORMATICA-AN INTERNATIONAL JOURNAL OF COMPUTING AND INFORMATICS, 2020, 44 (02): : 127 - 138
  • [6] Simple Assembly Line Balancing Problem with Power Peak Minimization
    Gianessi, Paolo
    Delorme, Xavier
    Masmoudi, Oussama
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR THE FACTORY OF THE FUTURE, PT I, 2019, : 239 - 247
  • [7] Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: A multi-objective approach
    Zhang, Zikai
    Tang, QiuHua
    Ruiz, Ruben
    Zhang, Liping
    COMPUTERS & OPERATIONS RESEARCH, 2020, 118
  • [8] An effective integer program for a general assembly line balancing problem with parallel workers and additional assignment restrictions
    Pearce, Bryan W.
    Antani, Kavit
    Mears, Laine
    Funk, Kilian
    Mayorga, Maria E.
    Kurz, Mary E.
    JOURNAL OF MANUFACTURING SYSTEMS, 2019, 50 : 180 - 192
  • [9] Modeling and Optimization of Parallel Disassembly Line Balancing Problem With Parallel Workstations
    Liang, Wei
    Zhang, Zeqiang
    Zeng, Yanqing
    Yin, Tao
    Wu, Tengfei
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2023, 19 (11) : 10684 - 10692