A line balancing problem with parallel workers and cycle time minimization

被引:0
|
作者
Melega, Gislaine Mara [1 ,2 ]
Belgarch, Sanae [1 ]
Jans, Raf [1 ]
Paquette, Julie [1 ]
机构
[1] HEC Montreal, Dept Logist & Operat Management, 3000 Chem Cote St Catherine, Montreal, PQ H3T 2A7, Canada
[2] CIRRELT, 3000 Chem Cote St Catherine, Montreal, PQ H3T 2A7, Canada
关键词
Line balancing; parallel stations; general and serial task structure; network flow formulation; third party logistics provider; MODEL ASSEMBLY LINES; ALGORITHM; MULTIPLE; ASSIGNMENT; DESIGN; OPTIMIZATION; WORKSTATIONS; BRANCH;
D O I
10.1080/03155986.2024.2393039
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We study the problem of balancing assembly lines with parallel workers, motivated by features observed at a third-party logistics provider. The assembly line differs from the two known types of line balancing problems in the literature since it determines simultaneously the line cycle time and the number of workers per station. Furthermore, each station can be occupied by more than one worker and a restriction on the minimum number of stations is imposed. This new type of line balancing problem minimizes the line cycle time, where two types of decisions must be made: how to group the tasks into stations and how many workers to assign to each station. We adapt mathematical models based on assembly line balancing problems with parallel stations. Furthermore, we propose a new model based on network flow formulations for the special case of lines with a serial task structure, frequently observed at the company. We perform an extensive computational study with realistic instances in order to compare the speed of solving different formulations, which is important as such a problem is at the operational level. We also provide a sensitivity analysis of key parameters aiming to better understand the trade-offs and provide meaningful managerial insights.
引用
收藏
页数:31
相关论文
共 50 条
  • [21] Minimising by Simulation-Based Optimisation the Cycle Time for the Line Balancing Problem in Real-World Environments
    Moncayo-Martinez, Luis A.
    He, Naihui
    Arias-Nava, Elias H.
    APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2025, 41 (01)
  • [22] Procedures for the Time and Space constrained Assembly Line Balancing Problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (03) : 473 - 481
  • [23] Estimation of time and cost oriented assembly line balancing problem
    Grzechca, Waldemar
    ICSENG 2008: INTERNATIONAL CONFERENCE ON SYSTEMS ENGINEERING, 2008, : 248 - 253
  • [24] A Salp Swarm Algorithm for Parallel Disassembly Line Balancing Considering Workers With Government Benefits
    Qin, Shujin
    Li, Jiawei
    Wang, Jiacun
    Guo, Xiwang
    Liu, Shixin
    Qi, Liang
    IEEE TRANSACTIONS ON COMPUTATIONAL SOCIAL SYSTEMS, 2024, 11 (01) : 282 - 291
  • [25] A mixed-integer programming model forcycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks
    Cavdur, F.
    Kaymaz, E.
    INTERNATIONAL JOURNAL OF PRODUCTION MANAGEMENT AND ENGINEERING, 2020, 8 (02) : 111 - 121
  • [26] A parallel station heuristic for the mixed-model production line balancing problem
    Askin, RG
    Zhou, M
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) : 3095 - 3105
  • [27] The simple assembly line balancing problem with parallel workstations - A simulated annealing approach
    Simaria, AS
    Vilarinho, PM
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2001, 8 (03): : 230 - 240
  • [28] A genetic simulated annealing algorithm for parallel partial disassembly line balancing problem
    Wang, Kaipu
    Li, Xinyu
    Gao, Liang
    Li, Peigen
    Gupta, Surendra M.
    APPLIED SOFT COMPUTING, 2021, 107
  • [29] Line Balancing and Sequencing for Peak Power Minimization
    Lamy, Damien
    Delorme, Xavier
    Gianessi, Paolo
    IFAC PAPERSONLINE, 2020, 53 (02): : 10411 - 10416
  • [30] Two-sided assembly line balancing problem with parallel performance capacity
    Sepahi, Abdollatif
    Naini, Seyed Gholamreza Jalali
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (13-14) : 6280 - 6292