Study on the Conflict Management Process Applied in the Construction of Integrated Transportation Hub Project

被引:0
|
作者
Xu, Shusheng [1 ]
Xu, Zhichao [2 ]
机构
[1] Tianjin Univ, Tianjin 300372, Peoples R China
[2] Tianjin Rail Transit Grp Co Ltd, Tianjin 300384, Peoples R China
关键词
conflict management process; integrated transportation hub; fuzzy set theory;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
According to the trait of Integrated Transportation Hub that it involves amount of stakeholders, dissevering the conflict management process will result in describing conflict inaccurately and keeping the conflict unresolved. Regarding of integrating the quantitative and qualitative approaches, we consider that resolving conflict needs pluralistic model to support. In accordance with the perceived level of the conflicts in Integrated Transportation Hub, the paper used fuzzy set theory to put forward conflict management process and elaborates on its content and application, which would help smooth the conflicts between different stakeholders and achieve the goal of minimizing the possibility of conflict.
引用
收藏
页码:62 / 66
页数:5
相关论文
共 50 条
  • [41] Conflict dynamics in a dam construction project: a case study
    Mahato, Braj Kishor
    Ogunlana, Stephen O.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2011, 1 (02) : 176 - 194
  • [42] Study on the model for concurrent life cycle project process management in construction industry
    Cheng Feifei
    Li Liangbao
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 530 - 534
  • [43] Study on the Construction Project Scheduling and Management Mode from the Perspective of Collaborative Management and Process Optimization
    Song Aiping
    INTERNATIONAL SYMPOSIUM 2017 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2017, : 84 - 88
  • [44] Study on Integrated Cost Management of Total Factors and Total Process in Construction Projects
    Li Nannan
    Li Qingli
    Zhang Jingtao
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 132 - 135
  • [45] The Construction Protest Management Study With NIMBY Conflict
    Lin, Lee-Kuo
    Zhou, Yu-Ru
    Lin, Jia-Wei
    APPLIED SCIENCE AND PRECISION ENGINEERING INNOVATION, PTS 1 AND 2, 2014, 479-480 : 1128 - +
  • [46] Project information portal applied in the professional management of large-scale construction project
    He, QH
    PROCEEDINGS OF THE 2003 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2003, : 306 - 309
  • [47] Effects of CM/GC Project Delivery on Managing Process Risk in Transportation Construction
    Farnsworth, Clifton B.
    Warr, Rebecca O.
    Weidman, Justin E.
    Hutchings, D. Mark
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [48] Visualizing System Engineering and Project Management as an Integrated Process
    Center for Systems Management, 19046 Pruneridge Avenue, Cupertino
    CA
    95014, United States
    INCOSE International Symposium, 1997, 7 (01): : 573 - 580
  • [49] Integrated management and optimization of construction project schedule, cost and quality
    Zhan Xiaran
    2018 INTERNATIONAL WORKSHOP ON ADVANCES IN SOCIAL SCIENCES (IWASS 2018), 2019, : 622 - 625
  • [50] Characterization of the information system integrated to the construction project management systems
    Leon-Romero, Luvis P.
    Aguilar-Fernandez, Mario
    Luque-Sendra, Amalia
    Zamora-Polo, Francisco
    Francisco-Marquez, Misaela
    HELIYON, 2024, 10 (11)