共 50 条
- [37] Batch-off equipment and problems of strip production during compound preparation KAUTSCHUK GUMMI KUNSTSTOFFE, 1998, 51 (10): : 710 - +
- [38] Batch-off equipment and problems of strip production during compound preparation KGK-Kautschuk und Gummi Kunststoffe, 1998, 51 (10): : 710 - 719
- [39] Structure optimization of coal blending equipment in coking 4TH INTERNATIONAL CONFERENCE ON APPLIED MATERIALS AND MANUFACTURING TECHNOLOGY, 2018, 423
- [40] Advances in delayed coking heat transfer equipment HYDROCARBON PROCESSING, 2009, 88 (02): : 45 - +