Quality Management Control Tool Development for Working with EPC Project

被引:0
|
作者
Kaewchaineim, Ratchanok [1 ]
Phusavat, Kongkiti [1 ]
机构
[1] Kasetsart Univ, Dept Ind Engn, Int Grad Program Engn Management, Bangkok, Thailand
来源
关键词
Quality control tools; 7QC tools; Quality improvement;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
If the company wish to success in the Engineering Procurement and Construction (EPC) business, quality of work is a very important factor to deal with. This paper reveals the impact of quality deficiencies which can lead to costs overrun due to rework and can also cause a delay in the time schedule. The concept of the quality management control tool for EPC project is to analyze the company's quality historical data by using basic quality analyzing tools, define the priority of impact from deficiencies and analyze the root cause to determine improvement activities. The results of deficiency data analysis help management to make decisions with regard to work quality improvement programs and priorities. This quality control tool aims to solve the quality problems in future EPC projects by developing check sheets to control the quality of work.
引用
收藏
页码:58 / +
页数:3
相关论文
共 50 条
  • [41] QUALITY-CONTROL TECHNIQUES FOR A GIS DATABASE DEVELOPMENT PROJECT
    NUGENT, JL
    PHOTOGRAMMETRIC ENGINEERING AND REMOTE SENSING, 1995, 61 (05): : 523 - 527
  • [42] Training and Development Tool for the Open Innovation Quality Management System
    Zgodavova, K.
    Sutoova, A.
    2017 15TH IEEE INTERNATIONAL CONFERENCE ON EMERGING ELEARNING TECHNOLOGIES AND APPLICATIONS (ICETA 2017), 2017, : 523 - 526
  • [43] Development of a tool to assess the quality of collected pavement management data
    Wolters, Angela S.
    McGovern, Ginger
    Hoerner, Todd
    PAVE MANAGEMENT; MONITORING, EVALUATION, AND DATA STORAGE; AND ACCELERATYED TESTING 2006, 2006, (1974): : 37 - 46
  • [44] Benchmarking and monitoring quality of COPD management in primary care (joint working project with GSK)
    Singh, Mukesh
    Trundle, Alison
    Scott, Pauline
    Short, Duncan
    Manzie, Joan
    EUROPEAN RESPIRATORY JOURNAL, 2014, 44
  • [45] Semantic Model of Project Management as Diagnostic tool in Project Stakeholder Management
    Bartoska, Jan
    Jedlanova, Tereza
    Rydval, Jan
    38TH INTERNATIONAL CONFERENCE ON MATHEMATICAL METHODS IN ECONOMICS (MME 2020), 2020, : 25 - 31
  • [46] The Innovative Application of P6 in EPC Project Management
    Zhu, Yong-ming
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 263 - 267
  • [47] Development and Baseline Characterization of a Thrombosis Risk Alert Tool: A Quality Assessment Project
    Sathe, Claire M.
    Poon, Chester
    Sarasohn, Debra M. M.
    Gilbert, Leah
    Khorana, Alok A.
    Mantha, Simon
    Soff, Gerald A.
    BLOOD, 2020, 136
  • [48] SUBCONTRACTING MANAGEMENT IN AN EPC PROJECT: A CASE STUDY OF DELAY RISKS
    Tamin, Puti Farida
    Perwitasari, Dian
    Tamin, Rizal
    IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 1045 - 1050
  • [49] Development of a management support tool for stricto sensu graduate programs A contingency approach to project management
    Camara, Ricardo Antonio
    Maccari, Emerson Antonio
    Nogueira Ferraz, Renato Ribeiro
    REGE-REVISTA DE GESTAO, 2019, 26 (02): : 180 - 195
  • [50] Quality management tool
    不详
    AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2000, 72 (02): : 196 - 197