Time and cost trade-off management for scheduling parallel applications on Utility Grids

被引:77
|
作者
Garg, Saurabh Kumar [1 ]
Buyya, Rajkumar [1 ]
Siegel, Howard Jay [2 ,3 ]
机构
[1] Univ Melbourne, Grid Comp & Distributed Syst Lab, Dept Comp Sci & Software Engn, Melbourne, Vic 3010, Australia
[2] Colorado State Univ, Dept Elect & Comp Engn, Ft Collins, CO 80523 USA
[3] Colorado State Univ, Dept Comp Sci, Ft Collins, CO 80523 USA
基金
美国国家科学基金会;
关键词
Grid computing; Meta-scheduling; Market-oriented; Resource management; INDEPENDENT TASKS; COMPUTING SYSTEMS; JOBS; ALGORITHM;
D O I
10.1016/j.future.2009.07.003
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
With the growth of Utility Grids and various Grid market infrastructures, the need for efficient and cost effective scheduling algorithms is also increasing rapidly, particularly in the area of meta-scheduling. In these environments, users not only may have conflicting requirements with other users, but also they have to manage the trade-off between time and cost such that their applications can be executed most economically in the minimum time. Thus, selection of the best Grid resources becomes a challenge in such a competitive environment. This paper presents three novel heuristics for scheduling parallel applications on Utility Grids that manage and optimize the trade-off between time and cost constraints. The performance of the heuristics is evaluated through extensive simulations of a real-world environment with real parallel workload models to demonstrate the practicality of our algorithms. We compare our scheduling algorithms against existing common meta-schedulers experimentally. The results show that our algorithms outperform existing algorithms by minimizing the time and cost of application execution on Utility Grids. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:1344 / 1355
页数:12
相关论文
共 50 条
  • [41] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [42] The Continuous Time-Resource Trade-off Scheduling Problem with Time Windows
    Artigues, Christian
    Hebrard, Emmanuel
    Quilliot, Alain
    Toussaint, Helene
    INFORMS JOURNAL ON COMPUTING, 2024, 36 (06) : 1676 - 1695
  • [43] A time - Cost trade-off algorithm for nonserial linear projects
    Senouci, AB
    Eldin, NN
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (01) : 134 - 149
  • [44] Testing the "Nonstopping" Time Trade-Off: Is It Better Than the Composite Time Trade-Off?
    Luo, Nan
    Augestad, Liv
    Rand, Kim
    VALUE IN HEALTH, 2020, 23 (11) : 1489 - 1496
  • [45] MTCTTM:A Cost-Time Scheduling Algorithm For Tasks In Utility Grids
    Mehri, Roholla
    Dastghaibyfard, Gh.
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON COMPUTER AND KNOWLEDGE ENGINEERING (ICCKE 2013), 2013, : 356 - 361
  • [46] Discounted and Expected Utility from the Probability and Time Trade-Off Model
    Cruz Rambaud, Salvador
    Sanchez Perez, Ana Maria
    MATHEMATICS, 2020, 8 (04)
  • [47] TIME TRADE-OFF UTILITY VALUES IN MILD AND SEVERE PRIMARY DYSMENORRHEA
    Rencz, F.
    Gulacsi, L.
    Varga, A. N.
    Sziklai, O. R.
    Pentek, M.
    Brodszky, V
    VALUE IN HEALTH, 2015, 18 (07) : A738 - A738
  • [48] HEALTH STATES UTILITY VALUES IN OSTEOPOROSIS USING TIME TRADE-OFF
    Kwon, H.
    Bae, G.
    An, J.
    Park, J.
    VALUE IN HEALTH, 2018, 21 : S82 - S82
  • [49] TIME TRADE-OFF HEALTH UTILITY VALUES FOR DEPRESSION: A SYSTEMATIC REVIEW
    Balazs, P.
    Erdosi, D.
    Rencz, F.
    Zemplenyi, A.
    Brodszky, V
    VALUE IN HEALTH, 2022, 25 (01) : S222 - S223
  • [50] A comparison of standard gamble, time trade-off, and adjusted time trade-off scores
    Martin, AJ
    Glasziou, PP
    Simes, RJ
    Lumley, T
    INTERNATIONAL JOURNAL OF TECHNOLOGY ASSESSMENT IN HEALTH CARE, 2000, 16 (01) : 137 - 147