Variable splitting applied to modelling of start-up costs in short term hydro generation scheduling

被引:57
|
作者
Nilsson, O [1 ]
Sjelvgren, D [1 ]
机构
[1] VATTENFALL AB,STOCKHOLM,SWEDEN
关键词
D O I
10.1109/59.589678
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper a mixed-integer hydro electric power model for short-term planning is discussed. The purpose of the model is to represent the generation characteristic of the Hydro plants accurately. In the modelling part the paper focuses on two requests stated from power producers in an earlier study. First, it is desirable to operate on points with good efficiency. Second, start-ups and shut-downs of the units should not be carried out too often, since this is related to a cost. The problem is decomposed into a subproblem for each hydro power plant by relaxing the power balance equation and using variable splitting, The advantage of this relaxation is that we can use network programming and dynamic programming methods, which have proved to work well for power system planning issues. The relaxation used in this work has, as far as we know, not been applied in the field before. The master problem is solved by a subgradient technique, Finally, a numerical example from a part of the Swedish power system illustrates the technique.
引用
收藏
页码:770 / 775
页数:6
相关论文
共 50 条
  • [41] Short-term hydro scheduling of a variable speed pumped storage hydropower plant considering head loss in a shared penstock
    Kong, J.
    Skjelbred, H. I.
    Abgottspon, H.
    29TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, 2019, 240
  • [42] Short-term scheduling strategies for hydro-wind-solar-storage considering variable-speed unit of pumped storage
    Wang, Huan
    Liao, Shengli
    Cheng, Chuntian
    Liu, Benxi
    Fang, Zhou
    Wu, Huijun
    APPLIED ENERGY, 2025, 377
  • [43] Parameters optimization for the generation of a keyhole weld pool during the start-up segment in variable-polarity plasma arc welding of aluminium alloys
    Zheng, B
    Wang, QI
    Kovacevic, R
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2000, 214 (05) : 393 - 400
  • [44] Fast Convergence Real-Coded Genetic Algorithm for Short-Term Solar-Wind-Hydro-Thermal Generation Scheduling
    Basu, Mousumi
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2018, 46 (11-12) : 1239 - 1249
  • [45] A novel two-swarm based PSO search strategy for optimal short-term hydro-thermal generation scheduling
    Cavazzini, G.
    Pavesi, G.
    Ardizzon, G.
    ENERGY CONVERSION AND MANAGEMENT, 2018, 164 : 460 - 481
  • [46] A Short-Term Optimal Scheduling Model for Wind-Solar-Hydro-Thermal Complementary Generation System Considering Dynamic Frequency Response
    Zhang, Qiuyan
    Xie, Jun
    Pan, Xueping
    Zhang, Liqin
    Fu, Denghui
    IEEE ACCESS, 2021, 9 : 142768 - 142781
  • [47] Short-Term Hydro Generation Scheduling of the Three Gorges Hydropower Station Using Improver Binary-coded Whale Optimization Algorithm
    Kun Yang
    Kan Yang
    Water Resources Management, 2021, 35 : 3771 - 3790
  • [48] SHORT-TERM OPTIMAL SCHEDULING MODEL FOR WIND-SOLAR-HYDRO HYBRID POWER GENERATION SYSTEM CONSIDERING DYNAMIC FREQUENCY RESPONSE
    Zhang Q.
    Xie J.
    Pan X.
    Liu M.
    Xiao Y.
    Feng L.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2023, 44 (01): : 516 - 524
  • [49] Short-Term Hydro Generation Scheduling of the Three Gorges Hydropower Station Using Improver Binary-coded Whale Optimization Algorithm
    Yang, Kun
    Yang, Kan
    WATER RESOURCES MANAGEMENT, 2021, 35 (11) : 3771 - 3790
  • [50] Research on short-term joint optimization scheduling strategy for hydro-wind-solar hybrid systems considering uncertainty in renewable energy generation
    Li, Fugang
    Chen, Shijun
    Ju, Chengqian
    Zhang, Xinshuo
    Ma, Guangwen
    Huang, Weibin
    ENERGY STRATEGY REVIEWS, 2023, 50