Capitalising teamwork for enhancing project delivery and management in construction: empirical study in Malaysia

被引:27
|
作者
Yap, Jeffs Ey Boon Hui [1 ]
Leong, Wen Jie [1 ]
Skitmore, Martin [2 ,3 ]
机构
[1] UTAR, Lee Kong Chian Fac Engn & Sci, Dept Surveying, Kajang, Malaysia
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
[3] Tongji Univ, Sch Econ & Management, Res Inst Complex Engn & Management, Shanghai, Peoples R China
关键词
Construction; Teamwork; Team effectiveness; Dimensions; Temporary project team; Project management; CRITICAL SUCCESS FACTORS; ORGANIZATIONAL CULTURE; PERFORMANCE; KNOWLEDGE; DELAYS; MODEL; COLLABORATION; TEAMS;
D O I
10.1108/ECAM-10-2019-0581
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Teamwork in the construction industry has attracted much attention from both academic and industrial circles. Most importantly, improving team effectiveness will increase the likelihood of successful project delivery. Recognising the factors influencing team dynamics is important for enhanced team performance. Design/methodology/approach Based on a detailed literature review, a survey questionnaire containing 10 aspects and 25 attributes of teamwork relevant to construction is used to collect feedback from Malaysian construction practitioners from client, consultant and contractor organisations to prioritise these hypothesised variables. The data are then subjected to reliability analysis, descriptive statistics (means, standard deviations, and frequencies), a one-sample t-test, the Kruskal-Wallis ANOVA and exploratory factor analysis. Findings The significance of these aspects and attributes is then presented. The three most crucial aspects are "project performance", "decision-making capability" and "problem-solving ability". The most influential attributes are "effective communication between project team members", "efficient team leadership", "well-defined team responsibilities and roles", "clear team goals and objectives" and "good collaboration between all project leaders". The Kruskal-Wallis ANOVA reveals five attributes having statistically significant differences with respect to company size, namely "clear team goals and objectives", "commitment to the project", "adequate resources", "team or task processes" and "creativity and innovation". Six underlying dimensions are found, comprising (1) participative engagement and task commitment; (2) team responsibility structure and accountability; (3) culture of trust and respect; (4) leader's skills and abilities; (5) top management support; and (6) synergic working environment. Practical implications - The identification of these dimensions for team effectiveness provides rigorous basis for formulating useful team-building strategies for integrating a collaborative environment among project stakeholders and consequently improving project performance. Originality/value This paper bridges the identified knowledge gap concerning the dimensionality of teamwork attributes in construction-based setting and adds to existing knowledge of how team effectiveness can be leveraged to improve project performance in the construction management literature.
引用
收藏
页码:1479 / 1503
页数:25
相关论文
共 50 条
  • [31] The Study on Risk Culture Management in Construction Project
    Zhang, Xiao-Bing
    Zhang, Xiao-Fu
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1712 - 1715
  • [32] The Study on the Digital Management System of Construction Project
    Chen Si
    Liu Yisheng
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 549 - 553
  • [33] Study on Management Control Auditing on Construction Project
    Wang, Xiaoyan
    Fan, Shaoyan
    HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 262 - +
  • [34] Study on Optimization of Construction Management of Large Project
    Guo, Chenghua
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 1346 - 1350
  • [35] Study for the Coordination and Management System on the Construction Project
    He, Jun
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2936 - 2939
  • [36] Study of construction project management maturity model
    Liqun, Liu
    Yuhua, An
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 355 - 360
  • [37] Study on lean construction project cost management
    Xiaolin, Yang
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 373 - 376
  • [38] Preliminary Study of the Digital Construction Project Management
    Fang, Xuemin
    Ding, Shaojie
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 223 - 226
  • [39] Impact of enterprise information systems on selected key performance indicators in construction project management: An empirical study
    Peter Mesároš
    Annamária Behúnová
    Tomáš Mandičák
    Marcel Behún
    Katarína Krajníková
    Wireless Networks, 2021, 27 : 1641 - 1648
  • [40] Application of Organizational Project Management Maturity Model (OPM3) to Construction in China: An Empirical Study
    Jia Guangshe
    Cao Li
    Chen Jianguo
    Zhou Shuisen
    Wang Jin
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 56 - +