Capitalising teamwork for enhancing project delivery and management in construction: empirical study in Malaysia

被引:27
|
作者
Yap, Jeffs Ey Boon Hui [1 ]
Leong, Wen Jie [1 ]
Skitmore, Martin [2 ,3 ]
机构
[1] UTAR, Lee Kong Chian Fac Engn & Sci, Dept Surveying, Kajang, Malaysia
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
[3] Tongji Univ, Sch Econ & Management, Res Inst Complex Engn & Management, Shanghai, Peoples R China
关键词
Construction; Teamwork; Team effectiveness; Dimensions; Temporary project team; Project management; CRITICAL SUCCESS FACTORS; ORGANIZATIONAL CULTURE; PERFORMANCE; KNOWLEDGE; DELAYS; MODEL; COLLABORATION; TEAMS;
D O I
10.1108/ECAM-10-2019-0581
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Teamwork in the construction industry has attracted much attention from both academic and industrial circles. Most importantly, improving team effectiveness will increase the likelihood of successful project delivery. Recognising the factors influencing team dynamics is important for enhanced team performance. Design/methodology/approach Based on a detailed literature review, a survey questionnaire containing 10 aspects and 25 attributes of teamwork relevant to construction is used to collect feedback from Malaysian construction practitioners from client, consultant and contractor organisations to prioritise these hypothesised variables. The data are then subjected to reliability analysis, descriptive statistics (means, standard deviations, and frequencies), a one-sample t-test, the Kruskal-Wallis ANOVA and exploratory factor analysis. Findings The significance of these aspects and attributes is then presented. The three most crucial aspects are "project performance", "decision-making capability" and "problem-solving ability". The most influential attributes are "effective communication between project team members", "efficient team leadership", "well-defined team responsibilities and roles", "clear team goals and objectives" and "good collaboration between all project leaders". The Kruskal-Wallis ANOVA reveals five attributes having statistically significant differences with respect to company size, namely "clear team goals and objectives", "commitment to the project", "adequate resources", "team or task processes" and "creativity and innovation". Six underlying dimensions are found, comprising (1) participative engagement and task commitment; (2) team responsibility structure and accountability; (3) culture of trust and respect; (4) leader's skills and abilities; (5) top management support; and (6) synergic working environment. Practical implications - The identification of these dimensions for team effectiveness provides rigorous basis for formulating useful team-building strategies for integrating a collaborative environment among project stakeholders and consequently improving project performance. Originality/value This paper bridges the identified knowledge gap concerning the dimensionality of teamwork attributes in construction-based setting and adds to existing knowledge of how team effectiveness can be leveraged to improve project performance in the construction management literature.
引用
收藏
页码:1479 / 1503
页数:25
相关论文
共 50 条
  • [21] PROJECT MANAGEMENT ASSESSMENTS (PMAs): AN EMPIRICAL STUDY
    Siriram, R.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 29 (01): : 108 - 127
  • [22] Construction Waste Management of Malaysia: Case Study in Penang
    Shan, Ng Lee
    Wee, Seow Ta
    Wai, Tan Lai
    Chen, Goh Kai
    ADVANCED SCIENCE LETTERS, 2018, 24 (06) : 4698 - 4703
  • [23] An empirical study on construction emergency disaster management and risk assessment in shield tunnel construction project with big data analysis
    Lu, Liyu
    Ji, Meiling
    Wen, Xi
    Xiang, Yong
    INTERNATIONAL JOURNAL OF DATA MINING AND BIOINFORMATICS, 2024, 28 (3-4) : 406 - 425
  • [24] The role of production and teamwork practices in construction safety: A cognitive model and an empirical case study
    Mitropoulos, Panagiotis 'Takis'
    Cupido, Gerardo
    JOURNAL OF SAFETY RESEARCH, 2009, 40 (04) : 265 - 275
  • [25] The effect of project manager's management style on project delivery success in construction projects
    Ghanbaripour, Amir Naser
    Golmoradi, Mehdi
    Langston, Craig
    Skulmoski, Greg
    Abu Arqoub, Muath
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (15) : 2941 - 2950
  • [26] The Empirical Analysis of the Introduction of Project Management Theory to the Apparatus of Association Construction
    Yao, Yao
    PROCEEDINGS OF THE 2018 4TH INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2018), 2018, 194 : 411 - 416
  • [27] Enhancing construction project supply chains and performance evaluation methods: a case study of a bridge construction project
    Pan, Nai-Hsin
    Lin, Yung-Yu
    Pan, Nang-Fei
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (08) : 1094 - 1106
  • [28] An empirical study on stakeholder management in construction projects
    Srinivasan, N. P.
    Dhivya, S.
    MATERIALS TODAY-PROCEEDINGS, 2020, 21 : 60 - 62
  • [29] Success in construction management of dams: an empirical study
    Amies, Pouya
    Jin, Xiaohua
    Senaratne, Sepani
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [30] A Comparative Study of Construction Waste Generation Rate Based on Different Construction Methods on Construction Project in Malaysia
    Maniam, Haritharan
    Nagapan, Sasitharan
    Abdullah, Abd Halid
    Subramaniam, Shivaraj
    Sohu, Samiullah
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (05) : 3488 - 3491