4D dynamic construction management and visualization software: 2. Site trial

被引:18
|
作者
Chau, KW [1 ]
Anson, M [1 ]
De Saram, DD [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Hong Kong, Hong Kong, Peoples R China
关键词
4D site management; construction planning; scheduling; site trial;
D O I
10.1016/j.autcon.2004.11.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The performance of any system can only be gauged by practical applications. This paper delineates some insight and experience on the on-site use of a prototype four-dimensional (4D) site management software system for a warehouse superstructure in Hong Kong. It links a three-dimensional model and a construction schedule to furnish visualization of the state of a site at any user-specified date. Site personnel generally view this system as potentially very promising and helpful. The 4D visualization is found to have capability to assist cognitive, reflective and analytical activities of site management. Through this site trial, some limitations of the software are also spotted which consequently lead to enhancement to the system. The prototype model may require a large amount of data input for large projects which lead to large computer files and slow processing speed. Hence, careful implementation of details is required in the planning level for practical 4D simulation modeling. This, however, will not be a long-term problem, given the recent advancement of computer technology. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:525 / 536
页数:12
相关论文
共 50 条
  • [41] 4D blood flow visualization fusing 3D and 4D MRA image sequences
    Forkert, Nils Daniel
    Fiehler, Jens
    Illies, Till
    Moeller, Dietmar P. F.
    Handels, Heinz
    Saering, Dennis
    JOURNAL OF MAGNETIC RESONANCE IMAGING, 2012, 36 (02) : 443 - 453
  • [42] Performance comparison analysis of 3D reconstruction modeling software in construction site visualization and mapping
    Keyvanfar, Ali
    Shafaghat, Arezou
    Rosley, Muhamad S. F.
    INTERNATIONAL JOURNAL OF ARCHITECTURAL COMPUTING, 2022, 20 (02) : 453 - 475
  • [43] Benefits and Barriers to the Adoption of 4D Modeling for Site Health and Safety Management
    Swallow, Mark
    Zulu, Sam
    FRONTIERS IN BUILT ENVIRONMENT, 2019, 4
  • [44] Integration of Radio-Frequency Identification and 4D CAD in Construction Management
    胡文发
    TsinghuaScienceandTechnology, 2008, (S1) : 151 - 157
  • [45] Strategies for representation and analyses of 4D modeling applied to construction project management
    Brito, Douglas M.
    Ferreira, Emerson A. M.
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 374 - 382
  • [46] SEEG4D: a tool for 4D visualization of stereoelectroencephalography data
    Evans, James L.
    Bramlet, Matthew T.
    Davey, Connor
    Bethke, Eliot
    Anderson, Aaron T.
    Huesmann, Graham
    Varatharajah, Yogatheesan
    Maldonado, Andres
    Amos, Jennifer R.
    Sutton, Bradley P.
    FRONTIERS IN NEUROINFORMATICS, 2024, 18
  • [47] THE INFORMATIVE VISUALIZATION METHOD OF THE 4D CAD MODEL
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2009, 16 (02): : 113 - 125
  • [48] Designing adapted visualization for collaborative 4D applications
    Boton, Conrad
    Kubicki, Sylvain
    Halin, Gilles
    AUTOMATION IN CONSTRUCTION, 2013, 36 : 152 - 167
  • [49] 4D visualization of matter: recent collected works
    Kauffman, George B.
    Kauffman, Laurie M.
    FOUNDATIONS OF CHEMISTRY, 2016, 18 (02) : 175 - 176
  • [50] Shadow-driven 4D haptic visualization
    Zhang, Hui
    Hanson, Andrew J.
    IEEE TRANSACTIONS ON VISUALIZATION AND COMPUTER GRAPHICS, 2007, 13 (06) : 1688 - 1695