4D dynamic construction management and visualization software: 2. Site trial

被引:18
|
作者
Chau, KW [1 ]
Anson, M [1 ]
De Saram, DD [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Hong Kong, Hong Kong, Peoples R China
关键词
4D site management; construction planning; scheduling; site trial;
D O I
10.1016/j.autcon.2004.11.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The performance of any system can only be gauged by practical applications. This paper delineates some insight and experience on the on-site use of a prototype four-dimensional (4D) site management software system for a warehouse superstructure in Hong Kong. It links a three-dimensional model and a construction schedule to furnish visualization of the state of a site at any user-specified date. Site personnel generally view this system as potentially very promising and helpful. The 4D visualization is found to have capability to assist cognitive, reflective and analytical activities of site management. Through this site trial, some limitations of the software are also spotted which consequently lead to enhancement to the system. The prototype model may require a large amount of data input for large projects which lead to large computer files and slow processing speed. Hence, careful implementation of details is required in the planning level for practical 4D simulation modeling. This, however, will not be a long-term problem, given the recent advancement of computer technology. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:525 / 536
页数:12
相关论文
共 50 条
  • [21] An integrated safety management with construction management using 4D CAD model
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SAFETY SCIENCE, 2010, 48 (03) : 395 - 403
  • [22] A Software Platform for Real-Time Visualization and Manipulation of 4D Cardiac Images
    Zhang, Qi
    Eagleson, Roy
    Peters, Terry M.
    FUNCTIONAL IMAGING AND MODELING OF THE HEART, PROCEEDINGS, 2009, 5528 : 396 - 406
  • [23] Dynamic visualization of urban terrain: Movement to navigation in 4D virtual worlds
    Harrison, JF
    Kliman, DH
    Roper, WE
    BATTLESPACE DIGITIZATION AND NETWORK-CENTRIC WARFARE II, 2002, 4741 : 317 - 328
  • [24] Atlas Construction for Dynamic (4D) PET Using Diffeomorphic Transformations
    Bieth, Marie
    Lombaert, Herve
    Reader, Andrew J.
    Siddiqi, Kaleem
    MEDICAL IMAGE COMPUTING AND COMPUTER-ASSISTED INTERVENTION - MICCAI 2013, PT II, 2013, 8150 : 35 - 42
  • [25] Integrating 4D BIM and GIS for Construction Supply Chain Management
    Deng, Yichuan
    Gan, Vincent J. L.
    Das, Moumita
    Cheng, Jack C. P.
    Anumba, Chimay
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [26] Construction Management Utilizing 4D CAD and Operations Simulation Methodologies
    张建平
    张洋
    胡振中
    鹿明
    TsinghuaScienceandTechnology, 2008, (S1) : 241 - 247
  • [27] Integrated 4D Design Change Management Model for Construction Projects
    Wang, Liannian
    Lee, Joomyung
    Nimawat, Jatin
    Han, Kevin
    Gupta, Abhinav
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [28] Construction Management Utilizing 4D CAD and Operations Simulation Methodologies
    Zhang, Jianping
    Zhang, Yang
    Hu, Zhenzhong
    Lu, Ming
    Tsinghua Science and Technology, 2008, 13 (SUPPL. 1): : 241 - 247
  • [29] 4D Visualization of Painted Sculpture and Murals
    Ai MingYao
    Tong Huai
    Shen Li
    Wang RuoXi
    Zhang Fang
    Zhang ZhiChao
    Hu QingWu
    Zhu YiXuan
    Zhang Heng
    25TH INTERNATIONAL CIPA SYMPOSIUM 2015, 2015, 40-5 (W7): : 1 - 5
  • [30] Visualization of 4D Vector Field Topology
    Hofmann, Lutz
    Rieck, Bastian
    Sadlo, Filip
    COMPUTER GRAPHICS FORUM, 2018, 37 (03) : 301 - 313