SOME ASPECTS OF THE USE AND USEFULNESS OF QUANTITATIVE RISK ANALYSIS TOOLS IN PROJECT MANAGEMENT

被引:1
|
作者
Hugo, F. D. [1 ]
Pretorius, L. [1 ]
Benade, S. J. [1 ]
机构
[1] Univ Pretoria, Dept Engn & Technol Management, Grad Sch Technol Management, Pretoria, South Africa
来源
关键词
D O I
10.7166/29-4-1821
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Central to project management is risk management - and the need to develop better and more specific tools to manage risk. This is driven by the desire to reduce uncertainty and risk on projects. Quantitative tools such as Monte Carlo simulation are sometimes used to analyse risk, but it is not clear how widespread, accepted, or useful such tools are for practising project personnel. This research was undertaken to gain feedback from practising project and risk management personnel about the use of risk management tools. Special attention was given to the levels of use of quantitative risk management tools and the benefits gained from their use. A conceptual framework was created linking the factors that affect tool use to the actual tool use levels, and ultimately to project performance. Research questions reported on in this paper addressed levels of tool use, factors that affect tool usage, and the benefit aspect of tool use on project performance. Data were gathered via an on-line questionnaire that was statistically analysed, and a number of hypotheses were tested. The results of this study show that the levels of use of both qualitative and quantitative risk management tools are low compared with general project management tools. Correlations were found between a number of factors that affect tool use.
引用
收藏
页码:116 / 128
页数:13
相关论文
共 50 条
  • [41] APPLICATION OF TOOLS AFFECTING ORGANIZATIONAL ASPECTS OF PROJECT MANAGEMENT - RECOMMENDATIONS FOR PRACTICE OF METALLURGICAL COMPANIES
    Kostalova, Jana
    Tetrevova, Libena
    METAL 2016: 25TH ANNIVERSARY INTERNATIONAL CONFERENCE ON METALLURGY AND MATERIALS, 2016, : 1863 - 1868
  • [42] SOME ASPECTS OF THE USE OF CHROMATOGRAPHY IN PHARMACEUTICAL ANALYSIS
    DENNIS, R
    PHARMACY INTERNATIONAL, 1985, 6 (11): : 275 - 279
  • [43] QUANTITATIVE RISK ANALYSIS AND HACCP - SOME REMARKS
    NOTERMANS, S
    JOUVE, JL
    FOOD MICROBIOLOGY, 1995, 12 (05) : 425 - 429
  • [44] An analysis of IT applications in construction project risk management
    Sun, CS
    Gu, GC
    Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 766 - 768
  • [45] Information approach to project risk analysis and management
    Natl. Tech. Univ., Ukraine Kyiv Politechnical Inst., Kyiv, Ukraine
    不详
    Journal of Automation and Information Sciences, 2000, 32 (11) : 58 - 64
  • [46] FROM COMPLEXITY ANALYSIS TO PROJECT RISK MANAGEMENT
    Canas Mejia, Gustavo
    REVISTA CIENCIAS ESTRATEGICAS, 2015, 23 (34): : 249 - 264
  • [47] Organization, management and risk analysis of the MAORY project
    Ciliegi, Paolo
    Diolaiti, Emiliano
    Bellazzini, Michele
    Cortecchia, Fausto
    Lombini, Matteo
    Abicca, Renata
    Esposito, Simone
    Feautrier, P.
    Stadler, Eric
    Giro, Enrico
    Ragazzoni, Roberto
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VIII, 2018, 10705
  • [48] The Analysis of Project Risk Management Based on AHP
    Liu Hongyan
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 576 - 579
  • [49] RISK ANALYSIS AS A PROJECT-MANAGEMENT TOOL
    ALLARDYCE, B
    POTTINGER, GM
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1985, 24 (02): : 54 - 59
  • [50] A gap analysis on the project risk management processes
    Seyedhoseini, Seyed Mohammad
    Noori, Siamak
    Hatefi, Mohammad Ali
    KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2008, 35 (1B): : 217 - 234