共 50 条
- [31] Risk criteria for use in quantitative risk analysis INTERNATIONAL CONFERENCE AND WORKSHOP ON RISK ANALYSIS IN PROCESS SAFETY, 1997, : 29 - 40
- [32] SOME QUANTITATIVE AND NUTRITIONAL ASPECTS OF THE PRODUCTION AND USE OF MILK POWDER NETHERLANDS MILK AND DAIRY JOURNAL, 1982, 36 (04): : 369 - 370
- [33] Some aspects of quantitative analysis and correction of radiation damage ACTA CRYSTALLOGRAPHICA SECTION D-BIOLOGICAL CRYSTALLOGRAPHY, 2006, 62 : 96 - 101
- [35] Project Risk Management: a Quantitative Approach through Simulation Tecniques PROCEEDINGS OF THE 8TH WSEAS INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND SIMULATION IN ENGINEERING (ICOSSSE '09), 2009, : 326 - 333
- [38] Use of reliability and risk analysis in project risk assessment PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1495 - 1500
- [39] Quantitative risk analysis of natural gas exploration project Tianranqi Gongye/Natural Gas Industry, 2000, 20 (02): : 98 - 100
- [40] Importance-performance analysis of project management tools in agribusiness REVISTA DE GESTAO E PROJETOS, 2019, 10 (01): : 51 - 64