An innovative slab track test-line in China

被引:0
|
作者
Ren, J. [1 ]
Xiang, R. [2 ]
Lechner, B. [3 ]
机构
[1] Southwest Jiao Tong Univ, Sch Civil Engn, Chengdu, Sichuan, Peoples R China
[2] Southwest JiaoTong Univ, Sch Traff & Transportat, Chengdu, Sichuan, Peoples R China
[3] Tech Univ Munich, Inst Rd Railway & Airfield Construct, Munich, Germany
来源
BEARING CAPACITY OF ROADS, RAILWAYS AND AIRFIELDS, VOLS 1 AND 2 | 2009年
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents the innovative slab track technology that was implemented in 2004 by the Chinese Ministry of Railways (MOR). The railway test-line Suiyu was decided to carry out, on which innovative slab track technology would be applied. With a total length of 13.157 km, the new line stands in southwest of China, which is one part of the eight planned passenger dedicated lines (PDL) in China. It is expected to be loaded annually with 20 million tonne freight transportation and daily with 90 passenger train-couples. Its design speed amounts to 200 km/h for passenger trains and 120 km/h for freight trains, which is the first railway line built with such speed in southwest of China. Six slab track types have been installed on the test-line as a trial, which are introduced in details in this paper, such as reinforced concrete slab with lattice two-block sleepers or with pre-stressed monolithic sleepers, coupled or uncoupled prefabricated slabs-superstructure etc. Turnouts have been laid with embedded, monolithic sleepers for the first time. Special measures were applied for transition zones. Comprehensive measurements in respect of their qualities have been carried out, meanwhile train experiment has also implemented to test every component of slab track as well as substructure.
引用
收藏
页码:1243 / +
页数:2
相关论文
共 50 条
  • [41] Feasibility analysis of magnesium phosphate cement as a repair material for base slab of China railway track system II ballastless track
    Jiang, Hailou
    Zhang, Jiwen
    Li, Tao
    Wang, Yi
    Liu, Yilun
    De Backer, Hans
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 326
  • [42] In-situ Comparison Test of Vibration Reduction Effect of the Steel Spring Floating Slab Track
    Li M.
    Wu Z.
    Ma M.
    Wang W.
    Zhang S.
    Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement and Diagnosis, 2024, 44 (01): : 44 - 51and196
  • [43] Concrete slab track state of the practice
    Tayabji, SD
    Bilow, D
    INTERCITY PASSENGER RAIL; FREIGHT RAIL; AND TRACK DESIGN AND MAINTENANCE: RAIL, 2001, (1742): : 87 - 96
  • [44] Prediction of slab track settlement using an innovative 3D train-track numerical tool: Full-Scale laboratory validation
    Matias, Samuel R.
    Ferreira, Patricia A.
    Sainz-Aja, Jose A.
    Pomb, Joao
    CONSTRUCTION AND BUILDING MATERIALS, 2023, 408
  • [45] Slab track - the Berlin LRV system
    Feste Fahrbahn - Stadtbahn Berlin
    1600, Verband Deutscher Eisenbahn-Ingenieure-VDEI-E.V., Frankfurt, Germany (46):
  • [46] PARAMETRIC STUDY ON FLOATING SLAB TRACK
    Ding, D. Y.
    Liu, W. N.
    Liu, W. F.
    Sun, X. J.
    ENVIRONMENTAL VIBRATIONS: PREDICTION, MONITORING, MITIGATION AND EVALUATION, VOLS I AND II, 2009, : 733 - 738
  • [47] Slab track in the Upper Rhine region
    Die feste fahrbahn am hochrhein
    2001, Tetzlaff Verlag GmbH and Co. KG (52):
  • [48] Shinkansen slab track to be laid on earthworks
    Japan Railway Construction Public, Corp
    Railw Gaz Int, 3 (3pp):
  • [49] Design methodology of slab track systems
    Giannakos, K.
    Tsoukantas, S.
    ADVANCES IN TRANSPORTATION GEOTECHNICS, 2008, : 585 - +
  • [50] CHANGING CANT OF SLAB TRACK.
    Bramall, Bernard
    Rail Engineering International, 1974, 4 (04): : 167 - 168