The Effect of Lead-Time Weather Forecast Uncertainty on Outage Prediction Modeling

被引:18
|
作者
Yang, Feifei [1 ,2 ]
Cerrai, Diego [1 ,2 ]
Anagnostou, Emmanouil N. [1 ,2 ]
机构
[1] Univ Connecticut, Dept Civil & Environm Engn, Storrs, CT 06269 USA
[2] Univ Connecticut, Eversource Energy Ctr, Storrs, CT 06269 USA
来源
FORECASTING | 2021年 / 3卷 / 03期
关键词
forecast uncertainty; lead time; severe weather; machine learning; power outages; POWER; HURRICANES; EVENTS; VALIDATION; ALGORITHM; PRODUCTS; MACHINE; COVER; AREA;
D O I
10.3390/forecast3030031
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Weather-related power outages affect millions of utility customers every year. Predicting storm outages with lead times of up to five days could help utilities to allocate crews and resources and devise cost-effective restoration plans that meet the strict time and efficiency requirements imposed by regulatory authorities. In this study, we construct a numerical experiment to evaluate how weather parameter uncertainty, based on weather forecasts with one to five days of lead time, propagates into outage prediction error. We apply a machine-learning-based outage prediction model on storm-caused outage events that occurred between 2016 and 2019 in the northeastern United States. The model predictions, fed by weather analysis and other environmental parameters including land cover, tree canopy, vegetation characteristics, and utility infrastructure variables exhibited a mean absolute percentage error of 38%, Nash-Sutcliffe efficiency of 0.54, and normalized centered root mean square error of 68%. Our numerical experiment demonstrated that uncertainties of precipitation and wind-gust variables play a significant role in the outage prediction uncertainty while sustained wind and temperature parameters play a less important role. We showed that, while the overall weather forecast uncertainty increases gradually with lead time, the corresponding outage prediction uncertainty exhibited a lower dependence on lead times up to 3 days and a stepwise increase in the four- and five-day lead times.
引用
收藏
页码:501 / 516
页数:16
相关论文
共 50 条
  • [41] Performance Measurment and Lead-Time Reduction in EPC Project-Based Organizations: A Mathematical Modeling Approach
    Ghasemi, Matina
    Nejad, Mazyar Ghadiri
    Alsaadi, Naif
    Abdel-Jaber, Mu'tasim
    Ab Yajid, Mohd Shukri
    Habib, Mamun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [42] Combating lead-time uncertainty in global supply chain's shipment-assignment: Is it wise to be risk-averse?
    Sun, Xuting
    Chung, Sai-Ho
    Choi, Tsan-Ming
    Sheu, Jiuh-Biing
    Ma, Hoi Lam
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2020, 138 (138) : 406 - 434
  • [43] A 27 day persistence model of near-Earth solar wind conditions: A long lead-time forecast and a benchmark for dynamical models
    Owens, M. J.
    Challen, R.
    Methven, J.
    Henley, E.
    Jackson, D. R.
    SPACE WEATHER-THE INTERNATIONAL JOURNAL OF RESEARCH AND APPLICATIONS, 2013, 11 (05): : 225 - 236
  • [44] Visualization of uncertainty and ensemble data: Exploration of climate modeling and weather forecast data with integrated ViSUS-CDAT systems
    Potter, Kristin
    Wilson, Andrew
    Bremer, Peer-Timo
    Williams, Dean
    Doutriaux, Charles
    Pascucci, Valerio
    Johhson, Chris
    SCIDAC 2009: SCIENTIFIC DISCOVERY THROUGH ADVANCED COMPUTING, 2009, 180
  • [45] Short-term wind power prediction based on the combination of numerical weather forecast and time series
    Zeng, Liang
    Lan, Xin
    Wang, Shanshan
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2023, 15 (01)
  • [46] Precipitation prediction modeling using neural network and empirical orthogonal function base on numerical weather forecast production
    Jin, Long
    Lin, Jianling
    Lin, Kaiping
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 2723 - +
  • [47] Bullwhip Effect of Weighted Moving Average Forecast under Stochastic Lead Time
    Nakade, Koichi
    Aniyama, Yuta
    IFAC PAPERSONLINE, 2019, 52 (13): : 1277 - 1282
  • [48] Age at death of patients with colorectal cancer and the effect of lead-time bias on survival in elective vs emergency surgery
    MacDonald, A. J.
    McEwan, H.
    McCabe, M.
    Macdonald, A.
    COLORECTAL DISEASE, 2011, 13 (05) : 519 - 525
  • [49] Enhancing Weather-Related Outage Prediction and Precursor Discovery Through Attention-Based Multi-Level Modeling
    Alqudah, Mohammad
    Obradovic, Zoran
    IEEE ACCESS, 2023, 11 : 94840 - 94851
  • [50] Streamflow forecast uncertainty evolution and its effect on real-time reservoir operation
    Chen, Lu
    Singh, Vijay P.
    Lu, Weiwei
    Zhang, Junhong
    Zhou, Jianzhong
    Guo, Shenglian
    JOURNAL OF HYDROLOGY, 2016, 540 : 712 - 726