The Effect of Lead-Time Weather Forecast Uncertainty on Outage Prediction Modeling

被引:18
|
作者
Yang, Feifei [1 ,2 ]
Cerrai, Diego [1 ,2 ]
Anagnostou, Emmanouil N. [1 ,2 ]
机构
[1] Univ Connecticut, Dept Civil & Environm Engn, Storrs, CT 06269 USA
[2] Univ Connecticut, Eversource Energy Ctr, Storrs, CT 06269 USA
来源
FORECASTING | 2021年 / 3卷 / 03期
关键词
forecast uncertainty; lead time; severe weather; machine learning; power outages; POWER; HURRICANES; EVENTS; VALIDATION; ALGORITHM; PRODUCTS; MACHINE; COVER; AREA;
D O I
10.3390/forecast3030031
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Weather-related power outages affect millions of utility customers every year. Predicting storm outages with lead times of up to five days could help utilities to allocate crews and resources and devise cost-effective restoration plans that meet the strict time and efficiency requirements imposed by regulatory authorities. In this study, we construct a numerical experiment to evaluate how weather parameter uncertainty, based on weather forecasts with one to five days of lead time, propagates into outage prediction error. We apply a machine-learning-based outage prediction model on storm-caused outage events that occurred between 2016 and 2019 in the northeastern United States. The model predictions, fed by weather analysis and other environmental parameters including land cover, tree canopy, vegetation characteristics, and utility infrastructure variables exhibited a mean absolute percentage error of 38%, Nash-Sutcliffe efficiency of 0.54, and normalized centered root mean square error of 68%. Our numerical experiment demonstrated that uncertainties of precipitation and wind-gust variables play a significant role in the outage prediction uncertainty while sustained wind and temperature parameters play a less important role. We showed that, while the overall weather forecast uncertainty increases gradually with lead time, the corresponding outage prediction uncertainty exhibited a lower dependence on lead times up to 3 days and a stepwise increase in the four- and five-day lead times.
引用
收藏
页码:501 / 516
页数:16
相关论文
共 50 条
  • [31] Effects of Yield and Lead-Time Uncertainty on Retailer-Managed and Vendor-Managed Inventory Management
    Lee, Soonkyo
    Kim, Young Joo
    Cheong, Taesu
    Yoo, Seung Ho
    IEEE ACCESS, 2019, 7 : 176051 - 176064
  • [32] Modeling process cuts lead-time, cost on complex injection-mold tools.
    不详
    MOLDING SYSTEMS, 2000, 58 (01): : 38 - 39
  • [33] Ordering, wholesale pricing and lead-time decisions in a three-stage supply chain under demand uncertainty
    Xiao, Tiaojun
    Jin, Jiao
    Chen, Guohua
    Shi, Jing
    Xie, Maoquan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) : 840 - 852
  • [34] Modeling Uncertainty in Tidal Current Forecast Using Prediction Interval-Based SVR
    Kavousi-Fard, Abdollah
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2017, 8 (02) : 708 - 715
  • [35] Modeling Time-Varying Uncertainty of Multiple-Horizon Forecast Errors
    Clark, Todd E.
    McCracken, Michael W.
    Mertens, Elmar
    REVIEW OF ECONOMICS AND STATISTICS, 2020, 102 (01) : 17 - 33
  • [36] Unflipping the Flipped Classroom: Balancing for Maximum Effect in Minimum Lead-Time in Online Education
    Brandon, Drew T.
    JOURNAL OF CHEMICAL EDUCATION, 2020, 97 (09) : 3301 - 3305
  • [37] The effect of day-ahead weather forecast uncertainty on power lines' sag in DLR models
    Racz, Levente
    Szabo, David
    Gocsei, Gabor
    Nemeth, Balint
    2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [38] Effect of streamflow forecast uncertainty on real-time reservoir operation
    Zhao, Tongtiegang
    Cai, Ximing
    Yang, Dawen
    ADVANCES IN WATER RESOURCES, 2011, 34 (04) : 495 - 504
  • [39] The Effect of QPF on Real-Time Deterministic Hydrologic Forecast Uncertainty
    Adams, Thomas E., III
    Dymond, Randel
    JOURNAL OF HYDROMETEOROLOGY, 2019, 20 (08) : 1687 - 1705
  • [40] Prediction uncertainty of greenhouse electrical power and gas demand: Part 2, the role of parametric and weather forecast error
    Payne, H. J.
    van Henten, E. J.
    van Mourik, S.
    BIOSYSTEMS ENGINEERING, 2024, 239 : 25 - 34