The Effect of Lead-Time Weather Forecast Uncertainty on Outage Prediction Modeling

被引:18
|
作者
Yang, Feifei [1 ,2 ]
Cerrai, Diego [1 ,2 ]
Anagnostou, Emmanouil N. [1 ,2 ]
机构
[1] Univ Connecticut, Dept Civil & Environm Engn, Storrs, CT 06269 USA
[2] Univ Connecticut, Eversource Energy Ctr, Storrs, CT 06269 USA
来源
FORECASTING | 2021年 / 3卷 / 03期
关键词
forecast uncertainty; lead time; severe weather; machine learning; power outages; POWER; HURRICANES; EVENTS; VALIDATION; ALGORITHM; PRODUCTS; MACHINE; COVER; AREA;
D O I
10.3390/forecast3030031
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Weather-related power outages affect millions of utility customers every year. Predicting storm outages with lead times of up to five days could help utilities to allocate crews and resources and devise cost-effective restoration plans that meet the strict time and efficiency requirements imposed by regulatory authorities. In this study, we construct a numerical experiment to evaluate how weather parameter uncertainty, based on weather forecasts with one to five days of lead time, propagates into outage prediction error. We apply a machine-learning-based outage prediction model on storm-caused outage events that occurred between 2016 and 2019 in the northeastern United States. The model predictions, fed by weather analysis and other environmental parameters including land cover, tree canopy, vegetation characteristics, and utility infrastructure variables exhibited a mean absolute percentage error of 38%, Nash-Sutcliffe efficiency of 0.54, and normalized centered root mean square error of 68%. Our numerical experiment demonstrated that uncertainties of precipitation and wind-gust variables play a significant role in the outage prediction uncertainty while sustained wind and temperature parameters play a less important role. We showed that, while the overall weather forecast uncertainty increases gradually with lead time, the corresponding outage prediction uncertainty exhibited a lower dependence on lead times up to 3 days and a stepwise increase in the four- and five-day lead times.
引用
收藏
页码:501 / 516
页数:16
相关论文
共 50 条
  • [1] Ordering, Pricing, and Lead-Time Quotation Under Lead-Time and Demand Uncertainty
    Wu, Zhengping
    Kazaz, Burak
    Webster, Scott
    Yang, Kum-Khiong
    PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (03) : 576 - 589
  • [2] Recursive behavior of safety stock reduction: The effect of lead-time uncertainty
    Wang, Ping
    Hill, James A.
    DECISION SCIENCES, 2006, 37 (02) : 285 - 290
  • [3] The impact of lead-time uncertainty in product configuration
    Song, Qinyu
    Ni, Yaodong
    Ralescu, Dan A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (03) : 959 - 981
  • [4] MODELING LEAD-TIME DEMAND FOR LUMPY DEMAND AND VARIABLE LEAD TIME
    BAGCHI, U
    NAVAL RESEARCH LOGISTICS, 1987, 34 (05) : 687 - 704
  • [5] Flexible backup supply and the management of lead-time uncertainty
    Kouvelis, Panos
    Li, Jian
    PRODUCTION AND OPERATIONS MANAGEMENT, 2008, 17 (02) : 184 - 199
  • [6] Airport capacity prediction with explicit consideration of weather forecast uncertainty
    Kicinger R.
    Chen J.-T.
    Steiner M.
    Pinto J.
    1600, American Institute of Aeronautics and Astronautics Inc. (24): : 18 - 28
  • [7] Quantify the Coupled GEFS Forecast Uncertainty for the Weather and Subseasonal Prediction
    Zhu, Yuejian
    Fu, Bing
    Yang, Bo
    Guan, Hong
    Sinsky, Eric
    Li, Wei
    Peng, Jiayi
    Xue, Xianwu
    Hou, Dingchen
    Liang, Xin-Zhong
    Shin, Sanghoon
    JOURNAL OF GEOPHYSICAL RESEARCH-ATMOSPHERES, 2023, 128 (02)
  • [8] The inventory billboard effect on the lead-time decision
    Wu, Zhengping
    Zhai, Xin
    Liu, Zhongyi
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 170 : 45 - 53
  • [9] Quantifying the evolution of ensemble water temperature forecasts as a function of weather forecast lead-time: case study on the Nechako River watershed
    Charles, Paul
    Arsenault, Richard
    Martel, Jean-Luc
    Gatien, Philippe
    St-Hilaire, Andre
    CANADIAN WATER RESOURCES JOURNAL, 2023, 48 (02) : 72 - 92
  • [10] Modeling the shortest delivery lead-time in supply chain
    Gong Dai-hua
    Proceeding of the 2006 International Conference on Management of Logistics and Supply Chain, 2006, : 134 - 138