Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory

被引:26
|
作者
Liu, Jicai [1 ,2 ]
Gao, Ruolan [3 ]
Cheah, Charles Yuen Jen [4 ]
机构
[1] Southwest Jiaotong Univ, Sch Econ & Management, Dept Construct Management, 111,North Sect 1,2nd Circle Rd, Chengdu 610031, Sichuan, Peoples R China
[2] Cornell Univ, Sch Civil & Environm Engn, Dept Construct Management, Ithaca, NY 14853 USA
[3] Southwest Jiaotong Univ, Sch Econ & Management, Management Sci & Engn, Chengdu 610031, Sichuan, Peoples R China
[4] Quest Int Univ, Fac Business Management & Social Sci, Ipoh, Perak, Malaysia
基金
中国国家自然科学基金;
关键词
Public-private partnership; Early termination; Pricing mechanism; Real option; PUBLIC-PRIVATE PARTNERSHIPS; CONCESSIONS;
D O I
10.1061/(ASCE)ME.1943-5479.0000556
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The early termination of public-private partnerships (PPP) frequently occurs in large infrastructure projects. Studies have analyzed the issue of compensation arising from early termination; however, most have ignored optionality in managing the risks and uncertainties embedded in these settings. Using real option theory, this paper examines pricingmechanisms for early termination under two different scenarios, namely, those of excessively high or excessively low cash flows, wherein early termination of PPP projects occurs during the stage of the operation prior to the final stage of asset transfer. The results show that while the pricing of early termination is mainly determined by the actual cash flow profile, it is also related to the level of total investment and return on investment. The final value of compensation agreed upon is also dependent on the bargaining power of each party. These findings contribute new insights into the pricing mechanisms of early termination used by governments and private investors. The quantification and derivation of early termination prices up front serves as a valuable benchmark and a good starting point for both governments and investors during negotiations and addresses the issue of compensation for early termination in a fair and reasonable manner. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Valuing the Advantage of Early Termination: Adopting Real Options Theory for SaaS
    Jede, Andreas
    Teuteberg, Frank
    PROCEEDINGS OF THE 49TH ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS 2016), 2016, : 4880 - 4889
  • [32] Early Termination Mechanism of Public-Private Partnership Transportation Projects with Government Guarantee
    He, Yujia
    Shi, Lei
    Li, Zhongfu
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2022, 28 (04)
  • [33] OPTIMISATION OF PRICING AND SUBSIDIES FOR URBAN RAIL TRANSIT PPP PROJECTS BASED ON SATISFACTIONS OF MAIN STAKEHOLDERS
    Hu Yunpeng
    Wang Jianping
    Sun Hailing
    JOURNAL OF ENVIRONMENTAL PROTECTION AND ECOLOGY, 2018, 19 (01): : 435 - 449
  • [34] The Pricing Method of Venture Investment Project: Based on the Infinite Deferring Real Option
    Zeng Hui
    MANAGEMENT ENGINEERING AND APPLICATIONS, 2010, : 465 - 470
  • [35] Evaluation of Highway Projects under Government Support Mechanisms Based on an Option-Pricing Framework
    Mirzadeh, Iman
    Birgisson, Bjorn
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (04)
  • [36] A Real Option Based Model for the Valuation of Patent Protected Technological Innovation Projects
    Hernandez-Garcia, Daniel
    Guemes-Castorena, David
    Ponce Jaramillo, Idalia
    2017 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING AND TECHNOLOGY (PICMET), 2017,
  • [37] A real option based model for the valuation of patent protected technological innovation projects
    Daniel Hernandez-Garcia, Roberto
    Guemes-Castorena, David
    Estefania Ponce-Jaramillo, Idalia
    WORLD PATENT INFORMATION, 2018, 53 : 24 - 38
  • [38] Cost Allocation in PPP Projects: An Analysis Based on the Theory of "Contracts as Reference Points"
    Peng, Yichen
    Zhou, Jing
    Xu, Qiang
    Wu, Xiaoling
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2014, 2014
  • [39] Optimization of Open-pit Cutoff Grade Based on Option Pricing Theory
    Xie Yingliang
    Liu Yijun
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 950 - 953
  • [40] Choice Risk Management of Life Insurance Policy Based on Option Pricing Theory
    Tang Gengrong
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2008, : 956 - 959