Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory

被引:26
|
作者
Liu, Jicai [1 ,2 ]
Gao, Ruolan [3 ]
Cheah, Charles Yuen Jen [4 ]
机构
[1] Southwest Jiaotong Univ, Sch Econ & Management, Dept Construct Management, 111,North Sect 1,2nd Circle Rd, Chengdu 610031, Sichuan, Peoples R China
[2] Cornell Univ, Sch Civil & Environm Engn, Dept Construct Management, Ithaca, NY 14853 USA
[3] Southwest Jiaotong Univ, Sch Econ & Management, Management Sci & Engn, Chengdu 610031, Sichuan, Peoples R China
[4] Quest Int Univ, Fac Business Management & Social Sci, Ipoh, Perak, Malaysia
基金
中国国家自然科学基金;
关键词
Public-private partnership; Early termination; Pricing mechanism; Real option; PUBLIC-PRIVATE PARTNERSHIPS; CONCESSIONS;
D O I
10.1061/(ASCE)ME.1943-5479.0000556
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The early termination of public-private partnerships (PPP) frequently occurs in large infrastructure projects. Studies have analyzed the issue of compensation arising from early termination; however, most have ignored optionality in managing the risks and uncertainties embedded in these settings. Using real option theory, this paper examines pricingmechanisms for early termination under two different scenarios, namely, those of excessively high or excessively low cash flows, wherein early termination of PPP projects occurs during the stage of the operation prior to the final stage of asset transfer. The results show that while the pricing of early termination is mainly determined by the actual cash flow profile, it is also related to the level of total investment and return on investment. The final value of compensation agreed upon is also dependent on the bargaining power of each party. These findings contribute new insights into the pricing mechanisms of early termination used by governments and private investors. The quantification and derivation of early termination prices up front serves as a valuable benchmark and a good starting point for both governments and investors during negotiations and addresses the issue of compensation for early termination in a fair and reasonable manner. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] System Dynamics (SD) -based concession pricing model for PPP highway projects
    Xu, Yelin
    Sun, Chengshuang
    Skibniewski, Miroslaw J.
    Chan, Albert P. C.
    Yeung, John F. Y.
    Cheng, Hu
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (02) : 240 - 251
  • [22] A Pricing Approach to Real Option Based on Normal Cloud Model
    Yu, Shao-Wei
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4205 - 4208
  • [23] A real option-based model for promoting sustainable energy projects under the clean development mechanism
    Lee, Hyounkyu
    Park, Taeil
    Kim, Byungil
    Kim, Kyeongseok
    Kim, Hyoungkwan
    ENERGY POLICY, 2013, 54 : 360 - 368
  • [24] Developing a Performance-based Adjustment Mechanism for PPP Projects
    Li, Ya-shuai
    Xiong, Wei
    Wang, Li-guang
    Gao, Hui
    3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 297 - 300
  • [25] Study of Risk Allocation in PPP Projects Based on Altruistic Theory
    Wang, Yinglin
    Liu, Jicai
    Hwang, Bon-Gang
    2016 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS' 2016), 2016,
  • [26] Early termination compensation calculation in PPP project based on responsibility allocation
    School of Civil Engineering, Central South University, Changsha
    410075, China
    不详
    410007, China
    J. Railw. Sci. Eng., 4 (1130-1136): : 1130 - 1136
  • [27] Study on the Option Values of Solar Building Based on Real Option Theory
    Tang Yongzhong
    Liu Changbin
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 85 - +
  • [28] Modern asset pricing - A valuable real option complement to discounted cash flow modelling of mining projects
    Guj, P.
    Garzon, R.
    PROJECT EVALUATION CONFERENCE 2007, 2007, 2007 (04): : 113 - +
  • [29] An option pricing-based model for evaluating the financial viability of privatized infrastructure projects
    Ho, S. Ping
    Liu, Liang Y.
    Construction Management and Economics, 2002, 20 (02) : 143 - 156
  • [30] Stackelberg Game Model of Railway Freight Pricing Based on Option Theory
    Guo, Jingwei
    Xie, Zhongqi
    Li, Qinglin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2020, 2020