A two-stage composite heuristic for dual cycling quay crane scheduling problem

被引:0
|
作者
Wang, Dandan [1 ]
Li, Xiaoping [1 ]
Wang, Qian [1 ]
机构
[1] Southeast Univ, Minist Educ, Sch Comp Sci & Engn, Key Lab Comp Network & Informat Integrat, Nanjing 211189, Jiangsu, Peoples R China
关键词
container terminal; dual cycling; quay crane scheduling; PORT CONTAINER TERMINALS; CONSTRAINTS; OPERATIONS;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, hatch constrained quay crane scheduling problem is considered to minimize makespan with dual cycling, which can improve efficiency of operations and utilization of quay cranes. By analyzing precedence relationships intra- and inter-hatches, the problem is decomposed into two embedded sub-problems, each of which can be formulated as a 2-machine flow shop scheduling problem. A composite heuristic is introduced for stacks scheduling in a hatch by integrating the Johnson rule with a developed gap-shifting strategy. A better model is constructed for inter-hatches than existing ones, in which overlapped processing time is shorten and effectiveness can be improved by a reconstructive Johnson rule. Experimental results show that the proposed composite algorithm outperforms the existing hybrid heuristic.
引用
收藏
页码:1902 / 1907
页数:6
相关论文
共 50 条
  • [31] An efficient heuristic algorithm for solving a multi-vessel quay crane scheduling problem in container terminals
    Ding, Yi
    Chen, Xiazhong
    Chen, Kaimin
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 16 (3-4) : 454 - 477
  • [32] A Two-stage Heuristic Method for Vulcanization Production Scheduling
    Yu, Shengping
    Yang, Diancai
    Wang, Xiuying
    Zhu, Kehui
    Zheng, Binglin
    2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
  • [33] A two-stage heuristic approach for nurse scheduling problem: A case study in an emergency department
    Wong, T. C.
    Xu, M.
    Chin, K. S.
    COMPUTERS & OPERATIONS RESEARCH, 2014, 51 : 99 - 110
  • [34] A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning
    Toscano, Alyne
    Ferreira, Deisemara
    Morabito, Reinaldo
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2019, 31 (01) : 142 - 173
  • [35] A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning
    Alyne Toscano
    Deisemara Ferreira
    Reinaldo Morabito
    Flexible Services and Manufacturing Journal, 2019, 31 : 142 - 173
  • [36] A polynomial-time heuristic for the quay crane double-cycling problem with internal-reshuffling operations
    Liu, Ming
    Chu, Feng
    Zhang, Zizhen
    Chu, Chengbin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 81 : 52 - 74
  • [37] A Hybrid Meta-Heuristic Approach for Solving Single-Vessel Quay Crane Scheduling with Double-Cycling
    Eldemir, Fahrettin
    Taner, Mustafa Egemen
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2025, 13 (02)
  • [38] Multi-stage hybrid flow shop model for quay crane dual cycling in container terminals
    School of Transport Management, Dalian Maritime University, Dalian
    Liaoning
    116026, China
    Shanghai Jiaotong Daxue Xuebao, 4 (499-505):
  • [39] Research on Quay Crane Scheduling Problem By Hybrid Genetic Algorithm
    Liang, Cheng ji
    Huang, You fang
    Yang, Yang
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2131 - +
  • [40] Solving for a Quay Crane Scheduling and Assignment Problem by Simulated Annealing
    Tavakkoli-Moghaddam, Reza
    Taheri, Farid
    Bazzazi, Mohammad
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 326 - 333