A two-stage composite heuristic for dual cycling quay crane scheduling problem

被引:0
|
作者
Wang, Dandan [1 ]
Li, Xiaoping [1 ]
Wang, Qian [1 ]
机构
[1] Southeast Univ, Minist Educ, Sch Comp Sci & Engn, Key Lab Comp Network & Informat Integrat, Nanjing 211189, Jiangsu, Peoples R China
关键词
container terminal; dual cycling; quay crane scheduling; PORT CONTAINER TERMINALS; CONSTRAINTS; OPERATIONS;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, hatch constrained quay crane scheduling problem is considered to minimize makespan with dual cycling, which can improve efficiency of operations and utilization of quay cranes. By analyzing precedence relationships intra- and inter-hatches, the problem is decomposed into two embedded sub-problems, each of which can be formulated as a 2-machine flow shop scheduling problem. A composite heuristic is introduced for stacks scheduling in a hatch by integrating the Johnson rule with a developed gap-shifting strategy. A better model is constructed for inter-hatches than existing ones, in which overlapped processing time is shorten and effectiveness can be improved by a reconstructive Johnson rule. Experimental results show that the proposed composite algorithm outperforms the existing hybrid heuristic.
引用
收藏
页码:1902 / 1907
页数:6
相关论文
共 50 条
  • [21] A two-stage heuristic algorithm for locomotive scheduling
    Zhang, Jie
    Ni, Shaoquan
    Ge, Lulu
    Wang, Yuanyuan
    Information Technology Journal, 2013, 12 (11) : 2153 - 2159
  • [22] A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach
    Fu, Yi-Min
    Diabat, Ali
    Tsai, I-Tsung
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (15) : 6959 - 6965
  • [23] A linear programming based heuristic for solving a two-stage flowshop scheduling problem
    Figielska, Ewa
    ETFA 2007: 12TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOLS 1-3, 2007, : 392 - 397
  • [24] Lookahead batching heuristic for batch scheduling problem of two-stage hybrid flowshop
    Chi Y.
    Liu J.
    Chen Q.
    Mao N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10): : 2559 - 2570
  • [25] RETRACTED ARTICLE: Two efficient algorithms for a quay crane scheduling and assignment problem
    R. Tavakkoli-Moghaddam
    F. Taheri
    M. Bazzazi
    S. Salahi
    Journal of Intelligent Manufacturing, 2010, 21 (4) : 591 - 591
  • [26] Simulated Annealing Algorithm for the Quay Crane Scheduling Problem
    Liu, Yan-Na
    Wang, Rui
    Zhang, Xiao-Yu
    Li, Chang-Guo
    Zhong, Min
    Li, Yu-Hao
    PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 2307 - 2311
  • [27] Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Exposito Izquierdo, Christopher
    Gonazalez Velarde, Jose Luis
    Melian Batista, Belen
    Marcos Moreno-Vega, J.
    NATURE INSPIRED COOPERATIVE STRATEGIES FOR OPTIMIZATION (NICSO 2011), 2011, 387 : 183 - +
  • [28] Constraint programming approach to quay crane scheduling problem
    Unsal, Ozgur
    Oguz, Ceyda
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2013, 59 : 108 - 122
  • [29] A Column Generation Method for Quay Crane Scheduling Problem
    Zheng, Kewei
    Lu, Zhiqiang
    Sun, Xiaoming
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 81 - 85
  • [30] A Multi-Vessel Quay Crane Scheduling Problem
    AlAwar, Kalthoom
    Alawani, Mohamed
    Al Jaberi, Shamma
    2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,