Proposing a new function for evaluation of the financial risk of construction projects using Monte Carlo method: Application on Iranian construction industry

被引:11
|
作者
Ildarabadi, Pouria [1 ]
Alamatian, Javad [2 ]
机构
[1] Islamic Azad Univ, Civil Engn Dept, Taft Branch, Taft, Iran
[2] Islamic Azad Univ, Civil Engn Dept, Mashhad Branch, Mashhad, Razavi Khorasan, Iran
来源
关键词
Financial risk; Construction projects; Monte Carlo simulation; TIME; MANAGEMENT; ALLOCATION; MODELS; CBO;
D O I
10.1016/j.jobe.2021.103143
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, the financial risk of construction projects is investigated. This process is carried out by proposing a new function based on three design variables, i.e. Cost List (CL), Material Cost (MC) and Final estimation Cost (FC). Deviations of these parameters are evaluated in ten years period, from 2004 to 2014. In the next step, distribution function and their relative parameters (mean and standard deviation) are determined. The efficiency of the proposed function is verified using the Monte Carlo simulation approach. The proposed simulation process has an ability to evaluate the economic conditions of construction projects. Moreover, the suggested procedure helps to evaluate the financial risk with suitable accuracy.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Improved Infrared Thermography Based Image Construction for Biomedical applications using Markov Chain Monte Carlo method
    Umadevi, V.
    Suresh, S.
    Raghavan, S. V.
    2009 ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE AND BIOLOGY SOCIETY, VOLS 1-20, 2009, : 5360 - +
  • [42] A comprehensive assessment model for construction industry performance evaluation using factor analysis method
    Wang, Jiayuan
    Yuan, Hongping
    Liu, Jian
    PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 424 - 436
  • [43] Evaluation of calibration curve uncertainty using the Monte Carlo method. Application to turbidity measurement
    Ruban, Gwenaël
    Joannis, Claude
    Bulletin des Laboratoires des Ponts et Chaussees, 2008, (272): : 33 - 43
  • [44] Investment Risk Grade Evaluation of New Town Construction PPP Projects: Perspective from Private Sector
    Zhai, Wujuan
    Ding, Jiyong
    Ding, Leijie
    JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2021, 147 (02)
  • [45] 3D continuum radiative transfer - A new adaptive grid construction algorithm based on the Monte Carlo method
    Niccolini, G.
    Alcolea, J.
    ASTRONOMY & ASTROPHYSICS, 2006, 456 (01) : 1 - 12
  • [46] The Application of Fuzzy Synthesis Evaluation Method Based on The Analysis Network Process in Construction Project Risk Evaluation
    Yang Kaiyun
    Nie Qingpeng
    Zhang Ruiling
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1936 - +
  • [47] Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: an Iranian case study
    Balali, Amirhossein
    Moehler, Robert C.
    Valipour, Alireza
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (13) : 2577 - 2585
  • [48] Safety risk assessment in shopping center construction projects using Fuzzy Fault Tree Analysis method
    Aghaei P.
    Asadollahfardi G.
    Katabi A.
    Quality & Quantity, 2022, 56 (1) : 43 - 59
  • [49] Risk Allocation Optimization between Owner and Contractor in Construction Projects by Using the UTA-STAR Method
    Malekshah, Mohammad Ebrahim Ebrahimi
    Mehdiabadi, Amir
    Pourmansouri, Rezvan
    Spulbar, Cristi
    Birau, Ramona
    APPLIED SCIENCES-BASEL, 2022, 12 (17):
  • [50] Research and application of carbon footprint correction method in construction of new building evaluation model
    Bi, Xiaoqing
    Jiang, Zhendong
    2ND INTERNATIONAL CONFERENCE ON AIR POLLUTION AND ENVIRONMENTAL ENGINEERING, 2020, 450