Scheduling independent stochastic tasks under deadline and budget constraints

被引:9
|
作者
Canon, Louis-Claude [1 ,2 ]
Chang, Aurelie Kong Win [2 ]
Robert, Yves [2 ,3 ]
Vivien, Frederic [2 ]
机构
[1] Univ Bourgogne Franche Comte, FEMTO ST, Besancon, France
[2] Univ Lyon, ENSL, UCBL, CNRS,Inria,LIP, Lyon, France
[3] Univ Tennessee, Knoxville, TN USA
关键词
Independent tasks; stochastic cost; scheduling; budget; deadline; cloud platform; SCIENTIFIC WORKFLOWS; CLOUDS;
D O I
10.1177/1094342019852135
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This article discusses scheduling strategies for the problem of maximizing the expected number of tasks that can be executed on a cloud platform within a given budget and under a deadline constraint. The execution times of tasks follow independent and identically distributed probability laws. The main questions are how many processors to enroll and whether and when to interrupt tasks that have been executing for some time. We provide complexity results and an asymptotically optimal strategy for the problem instance with discrete probability distributions and without deadline. We extend the latter strategy for the general case with continuous distributions and a deadline and we design an efficient heuristic which is shown to outperform standard approaches when running simulations for a variety of useful distribution laws.
引用
收藏
页码:246 / 264
页数:19
相关论文
共 50 条
  • [41] A deadline and budget constrained cost-time optimization algorithm for scheduling dependent tasks in grid computing
    Feng, HL
    Song, GH
    Zheng, Y
    Xia, J
    GRID AND COOPERATIVE COMPUTING, PT 2, 2004, 3033 : 113 - 120
  • [42] Survivability-based Scheduling Algorithm for Bag-of-Tasks Applications with Deadline Constraints on Grids
    Wang, Shupeng
    Hin, Xiaochun
    Yu, Xiangzhan
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (04): : 13 - 18
  • [43] Microservice Workflow Scheduling with a Resource Configuration Model Under Deadline and Reliability Constraints
    Li, Wenzheng
    Li, Xiaoping
    Chen, Long
    Wang, Mingjing
    SENSORS, 2025, 25 (04)
  • [44] Scheduling Big Data Workflows in the Cloud under Budget Constraints
    Mohan, Aravind
    Ebrahimi, Mandi
    Lu, Shiyong
    Kotov, Alexander
    2016 IEEE INTERNATIONAL CONFERENCE ON BIG DATA (BIG DATA), 2016, : 2775 - 2784
  • [45] Elastic Scheduling of Scientific Workflows under Deadline Constraints in Cloud Computing Environments
    Anwar, Nazia
    Deng, Huifang
    FUTURE INTERNET, 2018, 10 (01)
  • [46] Improved schedulability analysis of implicit deadline tasks under limited preemption EDF scheduling
    Short, Michael
    2011 IEEE 16TH CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION (ETFA), 2011,
  • [47] Application-Level Scheduling with Deadline Constraints
    Wu, Huasen
    Lin, Xiaojun
    Liu, Xin
    Zhang, Youguang
    2014 PROCEEDINGS IEEE INFOCOM, 2014, : 2436 - 2444
  • [48] A MapReduce task scheduling algorithm for deadline constraints
    Zhuo Tang
    Junqing Zhou
    Kenli Li
    Ruixuan Li
    Cluster Computing, 2013, 16 : 651 - 662
  • [49] Optimal scheduling with deadline constraints in tree networks
    Bhattacharya, PP
    Tassiulas, L
    Ephremides, A
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1997, 42 (12) : 1703 - 1705
  • [50] Optimal scheduling with deadline constraints in tree networks
    IBM T.J. Watson Research Cent, Hawthorne, United States
    IEEE Trans Autom Control, 12 (1703-1705):