Scheduling independent stochastic tasks under deadline and budget constraints

被引:9
|
作者
Canon, Louis-Claude [1 ,2 ]
Chang, Aurelie Kong Win [2 ]
Robert, Yves [2 ,3 ]
Vivien, Frederic [2 ]
机构
[1] Univ Bourgogne Franche Comte, FEMTO ST, Besancon, France
[2] Univ Lyon, ENSL, UCBL, CNRS,Inria,LIP, Lyon, France
[3] Univ Tennessee, Knoxville, TN USA
关键词
Independent tasks; stochastic cost; scheduling; budget; deadline; cloud platform; SCIENTIFIC WORKFLOWS; CLOUDS;
D O I
10.1177/1094342019852135
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This article discusses scheduling strategies for the problem of maximizing the expected number of tasks that can be executed on a cloud platform within a given budget and under a deadline constraint. The execution times of tasks follow independent and identically distributed probability laws. The main questions are how many processors to enroll and whether and when to interrupt tasks that have been executing for some time. We provide complexity results and an asymptotically optimal strategy for the problem instance with discrete probability distributions and without deadline. We extend the latter strategy for the general case with continuous distributions and a deadline and we design an efficient heuristic which is shown to outperform standard approaches when running simulations for a variety of useful distribution laws.
引用
收藏
页码:246 / 264
页数:19
相关论文
共 50 条
  • [21] Energy-efficient workflow scheduling with budget-deadline constraints for cloud
    Taghinezhad-Niar, Ahmad
    Pashazadeh, Saeid
    Taheri, Javid
    COMPUTING, 2022, 104 (03) : 601 - 625
  • [22] GreenSched: An intelligent energy aware scheduling for deadline-and-budget constrained cloud tasks
    Kaur, Tarandeep
    Chana, Inderveer
    SIMULATION MODELLING PRACTICE AND THEORY, 2018, 82 : 55 - 83
  • [23] Hierarchical Model-based Associate Tasks Scheduling with the Deadline Constraints in the Cloud
    Mao, Yingchi
    Zhong, Haishi
    Li, Xiaofang
    2015 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, 2015, : 268 - 273
  • [24] A scheduling algorithm using sub-deadline for workflow applications under budget and deadline constrained
    Ting Sun
    Chuangbai Xiao
    Xiujie Xu
    Cluster Computing, 2019, 22 : 5987 - 5996
  • [25] A scheduling algorithm using sub-deadline for workflow applications under budget and deadline constrained
    Sun, Ting
    Xiao, Chuangbai
    Xu, Xiujie
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2019, 22 (Suppl 3): : S5987 - S5996
  • [26] A HEURISTIC SCHEDULING OF INDEPENDENT TASKS WITH BOTTLENECK RESOURCE CONSTRAINTS
    WANG, QZ
    LEISS, EL
    SIAM JOURNAL ON COMPUTING, 1995, 24 (02) : 235 - 241
  • [27] Scheduling Big Data Workflows in the Cloud under Deadline Constraints
    Ebrahimi, Mahdi
    Mohan, Aravind
    Lu, Shiyong
    2018 IEEE FOURTH INTERNATIONAL CONFERENCE ON BIG DATA COMPUTING SERVICE AND APPLICATIONS (IEEE BIGDATASERVICE 2018), 2018, : 33 - 40
  • [28] Scheduling independent stochastic tasks on heterogeneous cloud platforms
    Gao, Yiqin
    Canon, Louis-Claude
    Robert, Yves
    Vivien, Frederic
    2019 IEEE INTERNATIONAL CONFERENCE ON CLUSTER COMPUTING (CLUSTER), 2019, : 385 - 395
  • [29] On Optimal Scheduling Algorithms for Well-Structured Workows in the Cloud with Budget and Deadline Constraints
    Center for Cloud Computing, Shenzhen Institute of Advanced Technology, Chinese Academy of Science, China
    不详
    ON, Canada
    不详
    NB, Canada
    Int. J. on Artif. Intell. Tools, 2
  • [30] On Optimal Scheduling Algorithms for Well-Structured Workflows in the Cloud with Budget and Deadline Constraints
    Wang, Yang
    Shi, Wei
    Kent, Kenneth B.
    PARALLEL PROCESSING LETTERS, 2016, 26 (02)