Optimal Long Term Hydro Scheduling Linked to Average Electricity Market Prices

被引:0
|
作者
Hreinsson, Egill Benedikt [1 ]
机构
[1] Univ Iceland, Sch Engn & Nat Sci, Hjardarhagi 6, Reykjavik, Iceland
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Traditionally, the Icelandic, island, hydro-based power system has been scheduled and planned based on local, isolated demand of two types: General Demand (GD) and the flat, now dominating Energy Intensive Industry (EII) demand. Thus a local load profile determines the scheduled operation, perhaps causing underutilization of resources, and water spillage. This limited flexibility is built into an isolated system, but interruptible EII contracts have served to increase the utilization to better meet the variable resource inflow (Water, geothermal steam). However, an access to a larger market would mitigate and change radically this limitation. Therefore a model based estimate of possible benefits is all important, when considering a UK-Iceland HVDC submarine link. This paper compares the optimal scheduling of a test system based on the Iceland system, with and without an external submarine link to a larger electricity market. A model HYDW1 uses linear programming (LP) and CPLEX to simulate weekly operations, using an official long term load forecast. This test system uses historical weekly averaged UK electricity spot prices and assumes a submarine link with preliminary cost estimates. The results quantify the benefits of trading flexible water power in a spot market, in terms of energy sales and operations costs by better utilizing the installed capacity, water flow and reservoirs. Finally, conclusions are drawn on expanding the weekly HYDW1 model to encompass a short term extension to enhance the future planning framework.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Long-term Forecasts for Electricity and Natural gas prices.
    Borggrefe, F.
    Lochner, S.
    BWK, 2009, 61 (09): : 50 - 59
  • [42] A preliminary investigation on optimal strategies of maintenance scheduling for generation companies in electricity market
    Wang, Jian
    Wen, Fu-Shuan
    Yang, Ren-Gang
    Yang, Ming-Hao
    Power System Technology, 2004, 28 (10) : 22 - 27
  • [43] Optimal scheduling model of virtual power plant in a unified electricity trading market
    Guo, Hongxia
    Bai, Hao
    Liu, Lei
    Wang, Yuli
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2015, 30 (23): : 136 - 145
  • [44] Integrating long-and short-term models for hydro scheduling
    Mo, B
    Haugstad, A
    Fosso, OB
    HYDROPOWER '97, 1997, : 279 - 285
  • [45] The long-term hydro-scheduling problem - a new algorithm
    Mantawy, AH
    Soliman, SA
    El-Hawary, ME
    ELECTRIC POWER SYSTEMS RESEARCH, 2003, 64 (01) : 67 - 72
  • [46] Optimal Energy Scheduling of Microgrid With Electric Vehicles Based on Electricity Market Price
    Hai, Tao
    Alazzawi, Ammar K.
    Zhou, Jincheng
    Muranaka, Tetsuya
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2023, 145 (06):
  • [47] Optimal scheduling of a microgrid in a volatile electricity market environment: Portfolio optimization approach
    Chen, Y.
    Trifkovic, M.
    APPLIED ENERGY, 2018, 226 : 703 - 712
  • [48] Project and system firm capacity definitions with long term hydro scheduling
    Hreinsson, Egill Benedikt
    2017 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2017,
  • [49] LONG-TERM-MEMORY IN STOCK-MARKET PRICES
    LO, AW
    ECONOMETRICA, 1991, 59 (05) : 1279 - 1313
  • [50] Long term hydro scheduling with short term load duration and linear transmission constraints
    Hreinsson, Egill Benedikt
    2016 51ST INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE (UPEC), 2016,