Long term hydro scheduling with short term load duration and linear transmission constraints

被引:0
|
作者
Hreinsson, Egill Benedikt [1 ]
机构
[1] Univ Iceland, Sch Engn & Nat Sci, Hjardarhagi 6, IS-107 Reykjavik, Iceland
关键词
Scheduling; Optimization; Linear programming; DC power flow; Energy; Hydro system; Renewable energy; OPTIMAL OPERATION; SYSTEMS; OPTIMIZATION; GENERATION; NETWORK;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Traditional solution methods for the long term hydro scheduling problem often omit short term phenomena such as daily load variations and transmission constraints. Simultaneously accounting for these factors in a single chronological optimization models, may lead to an overwhelming computational burden. Therefore acceptable approximations, that consider basic short term limitations, but still give the important reservoir control results for long term planning, are important. The paper recognizes that in hydro systems, chronology may often be omitted in the short term, when reservoirs are large enough to make short term fluctuations in volume and head negligible. Then reservoirs may be kept at a constant level in the short term to maintain constant head and are removed from the optimization. We remove this chronology by using load duration curves in the optimization. This simplifies the interacting short and long term time scales and, in addition, it is easy to account for transmission constraints, by using linear (DC) power flow. The paper defines an optimization model using linear programming (LP), but with transmission and load constraints, thereby accounting for important short term phenomena in a long term optimization model. The model is applied to a small six bus test system.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] OPTIMAL SHORT-TERM HYDRO SCHEDULING INCLUDING SECURITY CONSTRAINTS
    JOHANNESEN, A
    GJELSVIK, A
    FOSSO, OB
    FLATABO, N
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 576 - 583
  • [3] Nonlinear Medium-Term Hydro-Thermal Scheduling With Transmission Constraints
    Martins, L. S. A.
    Azevedo, A. T.
    Soares, S.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (04) : 1623 - 1633
  • [4] Integrating long-and short-term models for hydro scheduling
    Mo, B
    Haugstad, A
    Fosso, OB
    HYDROPOWER '97, 1997, : 279 - 285
  • [5] Efficiencies and Objectives in Short Term Hydro Scheduling
    Hreinsson, Egill Benedikt
    2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [6] The BC Hydro Short Term hydro scheduling Optimization Model
    Shawwash, ZK
    Siu, TK
    Russell, SO
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 1999, : 183 - 189
  • [7] The BC Hydro Short Term hydro scheduling optimization model
    Shawwash, ZK
    Siu, TK
    Russell, SOD
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) : 1125 - 1131
  • [8] Coordination between long-term and short-term generation scheduling with network constraints
    Marwali, MKC
    Shahidehpour, SM
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) : 1161 - 1167
  • [9] A practical mixed integer linear programming based short-term hydro scheduling
    Chang, GW
    Su, CT
    IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 1606 - 1610
  • [10] A Review of Short-Term Hydro Scheduling Tools
    Osorio, G. J.
    Matias, J. C. O.
    Catalao, J. P. S.
    2013 48TH INTERNATIONAL UNIVERSITIES' POWER ENGINEERING CONFERENCE (UPEC), 2013,