Long term hydro scheduling with short term load duration and linear transmission constraints

被引:0
|
作者
Hreinsson, Egill Benedikt [1 ]
机构
[1] Univ Iceland, Sch Engn & Nat Sci, Hjardarhagi 6, IS-107 Reykjavik, Iceland
关键词
Scheduling; Optimization; Linear programming; DC power flow; Energy; Hydro system; Renewable energy; OPTIMAL OPERATION; SYSTEMS; OPTIMIZATION; GENERATION; NETWORK;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Traditional solution methods for the long term hydro scheduling problem often omit short term phenomena such as daily load variations and transmission constraints. Simultaneously accounting for these factors in a single chronological optimization models, may lead to an overwhelming computational burden. Therefore acceptable approximations, that consider basic short term limitations, but still give the important reservoir control results for long term planning, are important. The paper recognizes that in hydro systems, chronology may often be omitted in the short term, when reservoirs are large enough to make short term fluctuations in volume and head negligible. Then reservoirs may be kept at a constant level in the short term to maintain constant head and are removed from the optimization. We remove this chronology by using load duration curves in the optimization. This simplifies the interacting short and long term time scales and, in addition, it is easy to account for transmission constraints, by using linear (DC) power flow. The paper defines an optimization model using linear programming (LP), but with transmission and load constraints, thereby accounting for important short term phenomena in a long term optimization model. The model is applied to a small six bus test system.
引用
收藏
页数:8
相关论文
共 50 条
  • [21] Short-Term and Long-Term Fluctuations of Hydro Generation.
    Schiller, G.
    Elektrichestvo, 1979, 32 (04): : 241 - 247
  • [22] Long-Term Optimal Scheduling of Hydro-Photovoltaic Hybrid Systems Considering Short-Term Operation Performance
    Yuan, Wenlin
    Sun, Zhangchi
    ENERGIES, 2024, 17 (21)
  • [23] Aggregated Hydro Unit Based Model for Short-term Hydro Generation Scheduling
    Zhai, Qiaozhu
    Xiao, Xun
    Li, Xuan
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4454 - 4459
  • [24] Long and short term scheduling tools in ESO
    Giannone, G
    Chavan, AM
    Silva, DR
    Krueger, AP
    Miller, GE
    ASTRONOMICAL DATA ANALYSIS SOFTWARE AND SYSTEMS IX, 2000, 216 : 111 - 114
  • [25] Short Term Hydro Thermal Scheduling Using Flower Pollination Algorithm
    Balachander, T.
    Jeyanthy, P. Aruna
    Devaraj, D.
    2017 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT TECHNIQUES IN CONTROL, OPTIMIZATION AND SIGNAL PROCESSING (INCOS), 2017,
  • [26] Short-term generation scheduling model of Fujian hydro system
    Wang, Jinwen
    ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (04) : 1085 - 1094
  • [27] A SHORT-TERM HYDROTHERMAL SCHEDULING APPROACH FOR DOMINANTLY HYDRO SYSTEMS
    OHISHI, T
    SOARES, S
    CARVALHO, MFH
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 637 - 643
  • [28] A coordinated approach for real-time short term hydro scheduling
    Tufegdzic, N
    Frowd, RJ
    Stadlin, WO
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (04) : 1698 - 1704
  • [29] Long-Term Scheduling with the Consideration of Interruptible Load
    Ge, Xiaolin
    Zhong, Junling
    Xia, Shu
    2016 IEEE INTERNATIONAL CONFERENCE ON POWER AND RENEWABLE ENERGY (ICPRE), 2016, : 373 - 377
  • [30] Long Short Term Memory Networks for Short-Term Electric Load Forecasting
    Narayan, Apurva
    Hipel, Keith W.
    2017 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2017, : 2573 - 2578