Progress and Challenges in the Construction of Wendelstein 7-X

被引:0
|
作者
Braeuer, Torsten [1 ]
Klinger, Thomas [1 ]
Bosch, Hans-Stephan [1 ]
机构
[1] EURATOM, Max Planck Inst Plasmaphys, D-17491 Greifswald, Germany
关键词
components; Stellarator; Wendelstein; 7-X; assembly; component alignment; metrology; mock up;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
This paper reports on experiences gained during the construction of the large, superconducting, optimized stellarator device Wendelstein 7-X. The goal of the project is to demonstrate the fusion reactor potential of optimized stellarators and to operate for the first time fusion-relevant plasmas under full steady-state conditions. In addition the validity of the engineering concept is to be proven under operating conditions. The actual construction of the device is now running since more than ten years and will require about three further years of assembly and integration. The current technical status of Wendelstein 7-X is reviewed, the major construction challenges are highlighted, and conclusions are drawn from past experiences that may also be useful for other large-scale science projects.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Project control of WENDELSTEIN 7-X
    Bünde, R
    Gottschewsky, M
    Heinrich, S
    FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 803 - 808
  • [22] Configuration Management for Wendelstein 7-X
    Brakel, R.
    v. Eeten, P.
    Hartmann, D. A.
    Henkelmann, K.
    Knauer, J.
    Mueller, K.
    Okkenga-Wolf, A.
    Wenzel, U.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 505 - 508
  • [23] ICRF heating for Wendelstein 7-X
    Wesner, F
    Hartmann, DA
    Birus, D
    Braun, F
    Wendorf, J
    FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 561 - 566
  • [24] OVERVIEW ON WENDELSTEIN 7-X THEORY
    NUHRENBERG, J
    LOTZ, W
    MERKEL, P
    NUHRENBERG, C
    SCHWENN, U
    STRUMBERGER, E
    HAYASHI, T
    FUSION TECHNOLOGY, 1995, 27 : 71 - 78
  • [25] Wendelstein 7-X at the transition to assembly
    Wegener, L.
    ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2007, 52 (8-9): : 558 - +
  • [26] Quality management for WENDELSTEIN 7-X
    Feist, JH
    Bramow, HJ
    Bräuer, T
    Gliege, G
    Kamionka, U
    Krause, B
    Pieger-Frey, M
    Wanner, M
    FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 809 - 813
  • [27] WENDELSTEIN 7-X at the transition to assembly
    Wegener, L
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 41 - 48
  • [28] Transition from Construction to Operation Phase of the Wendelstein 7-X Stellarator
    Bosch, Hans-Stephan
    Brakel, Rudolf
    Gasparotto, Maurizio
    Grote, Heinz
    Hartmann, Dirk A.
    Herrmann, Rene
    Nagel, Michael
    Naujoks, Dirk
    Otte, Matthias
    Risse, Konrad
    Rummel, Thomas
    Werner, Andreas
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2014, 42 (03) : 432 - 438
  • [29] Construction of the vacuum vessels and the magnet supporting structures of Wendelstein 7-X
    Cardella, A.
    Hein, B.
    Hennann, D.
    Koppe, T.
    Missal, B.
    Pilopp, D.
    Reich, J.
    Wanner, M.
    Jenzsch, H.
    Krause, R.
    Ploeckl, B.
    Di Bartolo, G.
    Leher, F.
    Binni, A.
    Segl, J.
    Benito, A.
    Giordano, L.
    Langone, S.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 1911 - 1916
  • [30] The layout of the WENDELSTEIN 7-X magnet
    Sapper, J
    Gardebrecht, W
    Kerl, F
    Schoenewolf, I
    FUSION ENGINEERING AND DESIGN, 2001, 58-59 : 237 - 240