Progress and Challenges in the Construction of Wendelstein 7-X

被引:0
|
作者
Braeuer, Torsten [1 ]
Klinger, Thomas [1 ]
Bosch, Hans-Stephan [1 ]
机构
[1] EURATOM, Max Planck Inst Plasmaphys, D-17491 Greifswald, Germany
关键词
components; Stellarator; Wendelstein; 7-X; assembly; component alignment; metrology; mock up;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
This paper reports on experiences gained during the construction of the large, superconducting, optimized stellarator device Wendelstein 7-X. The goal of the project is to demonstrate the fusion reactor potential of optimized stellarators and to operate for the first time fusion-relevant plasmas under full steady-state conditions. In addition the validity of the engineering concept is to be proven under operating conditions. The actual construction of the device is now running since more than ten years and will require about three further years of assembly and integration. The current technical status of Wendelstein 7-X is reviewed, the major construction challenges are highlighted, and conclusions are drawn from past experiences that may also be useful for other large-scale science projects.
引用
收藏
页数:6
相关论文
共 50 条
  • [11] Technical challenges in the construction of the steady-state stellarator Wendelstein 7-X
    Bosch, H. -S.
    Wolf, R. C.
    Andreeva, T.
    Baldzuhn, J.
    Birus, D.
    Bluhm, T.
    Braeuer, T.
    Braune, H.
    Bykov, V.
    Cardella, A.
    Durodie, F.
    Endler, M.
    Erckmann, V.
    Gantenbein, G.
    Hartmann, D.
    Hathiramani, D.
    Heimann, P.
    Heinemann, B.
    Hennig, C.
    Hirsch, M.
    Holtum, D.
    Jagielski, J.
    Jelonnek, J.
    Kasparek, W.
    Klinger, T.
    Koenig, R.
    Kornejew, P.
    Kroiss, H.
    Krom, J. G.
    Kuehner, G.
    Laqua, H.
    Laqua, H. P.
    Lechte, C.
    Lewerentz, M.
    Maier, J.
    McNeely, P.
    Messiaen, A.
    Michel, G.
    Ongena, J.
    Peacock, A.
    Pedersen, T. S.
    Riedl, R.
    Riemann, H.
    Rong, P.
    Rust, N.
    Schacht, J.
    Schauer, F.
    Schroeder, R.
    Schweer, B.
    Spring, A.
    NUCLEAR FUSION, 2013, 53 (12)
  • [12] Accuracy of the construction of the superconducting coils for WENDELSTEIN 7-X
    Rummel, T
    Risse, K
    Viebke, H
    Braeuer, T
    Kisslinger, J
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2004, 14 (02) : 1394 - 1398
  • [13] Cryotechnology for Wendelstein 7-X
    Schauer, F
    Bau, H
    Bozhko, Y
    Brockmann, R
    Nagel, M
    Pietsch, M
    Raatz, S
    FUSION ENGINEERING AND DESIGN, 2003, 66-68 : 1045 - 1048
  • [14] Cryostat for Wendelstein 7-X
    不详
    ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 1998, 43 (05): : 326 - 327
  • [15] Reflectometry for Wendelstein 7-X
    Hirsch, M.
    Holzhauer, E.
    Hartfuss, H. -J.
    NUCLEAR FUSION, 2006, 46 (09) : S853 - S861
  • [16] The Wendelstein 7-X Stellarator
    Wagner, F
    Milch, I
    ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2005, 50 (8-9): : 519 - +
  • [17] Challenges in the realization of the In-Vessel-Components of Wendelstein 7-X
    Stadler, R.
    Vorkoeper, A.
    Boscary, J.
    Li, Ch.
    Mendelevitch, B.
    Peacock, A.
    Pirsch, H.
    Freier, D.
    Lorenz, A.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 1686 - 1689
  • [18] Construction of Wendelstein 7-X - engineering a steady state stellarator
    Bosch, H. -S.
    Erckmann, V.
    Koenig, R.
    Schauer, F.
    Stadler, R.
    Werner, A.
    2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 696 - 702
  • [19] Risk management as an executive task in the construction of Wendelstein 7-X
    Vilbrandt, Reinhard
    Bosch, Hans-Stephan
    van Eeten, Paul
    FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 2151 - 2154
  • [20] Influence of construction errors on Wendelstein 7-X magnetic configurations
    Andreeva, T.
    Braeuer, T.
    Endler, M.
    Kisslinger, J.
    v. Toussaint, U.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 408 - 412