Progress and Challenges in the Construction of Wendelstein 7-X

被引:0
|
作者
Braeuer, Torsten [1 ]
Klinger, Thomas [1 ]
Bosch, Hans-Stephan [1 ]
机构
[1] EURATOM, Max Planck Inst Plasmaphys, D-17491 Greifswald, Germany
关键词
components; Stellarator; Wendelstein; 7-X; assembly; component alignment; metrology; mock up;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
This paper reports on experiences gained during the construction of the large, superconducting, optimized stellarator device Wendelstein 7-X. The goal of the project is to demonstrate the fusion reactor potential of optimized stellarators and to operate for the first time fusion-relevant plasmas under full steady-state conditions. In addition the validity of the engineering concept is to be proven under operating conditions. The actual construction of the device is now running since more than ten years and will require about three further years of assembly and integration. The current technical status of Wendelstein 7-X is reviewed, the major construction challenges are highlighted, and conclusions are drawn from past experiences that may also be useful for other large-scale science projects.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Progress, Challenges, and Lessons Learned in the Construction of Wendelstein 7-X
    Braeuer, Torsten
    Klinger, Thomas
    Bosch, Hans-Stephan
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2012, 40 (03) : 577 - 583
  • [2] PROGRESS TOWARDS WENDELSTEIN 7-X
    Rummel, Thomas
    FUSION SCIENCE AND TECHNOLOGY, 2013, 64 (03) : 387 - 396
  • [3] Status of WENDELSTEIN 7-X construction
    Wanner, M
    Erckmann, V
    Feist, JH
    Gardebrecht, W
    Hartmann, D
    Krampitz, R
    Niedermeyer, H
    Renner, H
    Rummel, T
    Schauer, F
    Wegener, L
    Wesner, F
    Müller, GA
    Kasparek, W
    Thumm, M
    Dammertz, G
    NUCLEAR FUSION, 2003, 43 (06) : 416 - 424
  • [4] Design and construction of WENDELSTEIN 7-X
    Wanner, M
    Feist, JH
    Renner, H
    Sapper, J
    Schauer, F
    Schneider, H
    Erckmann, V
    Niedermeyer, H
    FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 155 - 162
  • [5] Status of Wendelstein 7-X construction
    Wegener, L.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 106 - 112
  • [6] Status of Wendelstein 7-X construction
    Feist, JH
    FUSION SCIENCE AND TECHNOLOGY, 2004, 46 (01) : 192 - 199
  • [7] Construction and assembly of WENDELSTEIN 7-X
    Wanner, M.
    FUSION ENGINEERING AND DESIGN, 2006, 81 (20-22) : 2305 - 2313
  • [8] Status of WENDELSTEIN 7-X construction
    Feist, JH
    19TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, PROCEEDINGS, 2002, : 264 - 267
  • [9] Status of Wendelstein 7-X construction
    Schauer, F.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 443 - 453
  • [10] Wendelstein 7-X, overview and status of construction
    Bosch, Hans-Stephan