Module design of process evaluation contents of construction project

被引:0
|
作者
Ma, Z. D. [1 ]
Zheng, G. Y. [1 ]
机构
[1] Guangdong Univ Technol, Fac Civil & Transportat Engn, Dept Engn Management, Guangzhou 510006, Guangdong, Peoples R China
关键词
Construction project; Process evaluation; Life-cycle;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
After the economic crisis break out, in order to expand domestic demands and promote the economic grow steady and rapidly, Chinese government has issued a series of measures to rescue the stock market, and make a decision on NOV.5TH, 2008 in the executive meeting of state council, to invest 40 trillion in the coming two years. In such a short time, making such a large investment, people are concerned about if the fund can be used safely, reasonably and effectively. Aims at the problems that exist in process evaluation of construction project in our country, paper guided by scientific concept of development, according to the evaluating thought of modernize society, fixes the aims of process evaluation at three aspects of realistic thinking, rational thinking and philosophical thinking, and takes life cycle of construction project as main line, and divides it into five stages including decision making, design, preparation, execution and operation. Aims at technology, economy, environment and management, execute evaluation of aims, plan, execution, monitoring and effect, and establishes a three-dimensional system of process evaluation content module, finally designs contents of process evaluation in every stage.
引用
收藏
页码:1889 / 1893
页数:5
相关论文
共 50 条
  • [31] The Evaluation of Emergency Capacity for Construction Project
    Han Xishuang
    Wang Yaowu
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 235 - 238
  • [32] The Objective Evaluation of Road Construction Project
    Lin, Li
    Peng, Du
    Fei, Chai
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5224 - +
  • [33] CONSTRUCTION PROJECT EVALUATION PROGRAM UPDATE
    PATE, ZT
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 43 : 554 - 555
  • [34] Linking guide to Construction Project Information Model design for improved Construction Project Management
    Xu, YX
    Wang, YW
    Yao, B
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 508 - 511
  • [35] The design contents and key techniques of the green construction machinery
    He, Lile
    Zheng, Jianxiao
    2006 XI'AN INTERNATIONAL CONFERENCE OF ARCHITECTURE AND TECHNOLOGY, PROCEEDINGS: ARCHITECTURE IN HARMONY, 2006, : 848 - 851
  • [36] Linking Scholarly Contents: The Design and Construction of an Argumentation Graph†
    Song, Ningyuan
    Cheng, Hanghang
    Zhou, Huimin
    Wang, Xiaoguang
    KNOWLEDGE ORGANIZATION, 2022, 49 (04): : 213 - 235
  • [37] Analysis of Construction Innovation Process at Project Level
    Ozorhon, Beliz
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) : 455 - 463
  • [38] Clients' goals and the construction project management process
    Lindahl, Goran
    Ryd, Nina
    FACILITIES, 2007, 25 (3-4) : 147 - 156
  • [39] Research on Risk Assessment in Project Construction Process
    She, Yuexia
    Song, Zhengrong
    Wu, Hang
    Liu, Chao
    Sun, Liwen
    INTERNATIONAL CONFERENCE ON FRONTIERS OF ENERGY, ENVIRONMENTAL MATERIALS AND CIVIL ENGINEERING (FEEMCE 2013), 2013, : 124 - 128
  • [40] Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project
    Joseph, Sitara
    Stevens, Andria M.
    Ledoux, Tracey
    O'Connor, Teresia M.
    O'Connor, Daniel P.
    Thompson, Debbe
    JOURNAL OF NUTRITION EDUCATION AND BEHAVIOR, 2015, 47 (06) : 560 - U98